18 Live Notices for Africa Boilers Tenders
Showing 1 to 18
Supply And Delivery Of Boiler Chemicals
Supply And Installation Of Office Furniture
Unit 1-6 Main & Boiler Feed Pump Turbine (Bfpt) Condenser High Pressure Jet Washing During Various Outages, Running And Opportunity Maintenance For A Period Of Five (5) Years Based On As And When Required Basis At Lethabo Power Station.
Unit 1-6 Main & Boiler Feed Pump Turbine (Bfpt) Condenser High Pressure Jet Washing During Various Outages, Running And Opportunity Maintenance For A Period Of Five (5) Years Based On As And When Required Basis At Lethabo Power Station.
Unit 1-6 Main & Boiler Feed Pump Turbine (Bfpt) Condenser High Pressure Jet Washing During Various Outages, Running And Opportunity Maintenance For A Period Of Five (5) Years Based On As And When Required Basis At Lethabo Power Station.
Provision of Service & Maintenance of Steam Boiler and Compressors at EPS Factory Mavoko
Supply And Delivery Of Clothing Factory Plant Equipment
Acquisition Of An Overheating Sweep Of The Steam Boiler
Boilers 1-6 Smoke Stack Dust Monitor Correlation And Parallel Tests For A Period Of Five (05) Years At Matla Power Station
Boilers 1-6 Smoke Stack Dust Monitor Correlation And Parallel Tests For A Period Of Five (05) Years At Matla Power Station
Maintenance Of Soot Blower And Boiler Fans For A Period Of Five (5) Years At Matimba Power Station
Maintenance Of Soot Blower And Boiler Fans For A Period Of Five (5) Years At Matimba Power Station
Maintenance Of Soot Blower And Boiler Fans For A Period Of Five (5) Years At Matimba Power Station
Gf.24.3.0287 Retulating Work Of The Boiler Of The Sulfuric Unit A At The Dap Factory In Gabès Of The Tunisian Chemical Group
Preventive and Curative Maintenance of Boilers, Burners and Water and Steam Networks
Gfi.24.2.0053: Supply Of One (01) Lot Of 3000 Carbon Steel Tubes For Sg.3501 A And B Boiler Of The Sulfuric Acid Unit At The Gabes Dap Factory Of The Tunisian Chemical Group.
Regret Letter And Award Letter For Refurbishment Of Boiler Feed Pump Turbine Low Pressure Control Valve On Unit 1 – Unit 6 At Lethabo Power Station For Period Of 5 Years.
Regret Letter And Award Letter For Refurbishment Of Boiler Feed Pump Turbine Low Pressure Control Valve On Unit 1 – Unit 6 At Lethabo Power Station For Period Of 5 Years.