28 Live Notices for Africa Hvac Tenders
Showing 1 to 20
The Provision Of Hvac System Spares And Full Maintenance & Operation At Komati Power Station For A Period Of 36 Months.
Supply, install testing and commissioning of the new VRF HVAC at PSSSF Golden Jubilee Towers Phase I
PROVISION OF HEATING, VENTILATION & AIR CONDITIONING (HVAC) INSTALLATIONS INSTALLATIONS
Provision of a Suitable Qualified and Experienced Health and Safety Consulting Firm to perform Health and Safety Services for HVAC Upgrade to Lecture Venues (L-Block Part 1) at MUT – Main Campus for a period of 8 Months
Supply, Delivery And Installation Of Hvac (Heating, Ventilation And Cooling) System
Supply, Delivery And Installation Of Hvac (Heating, Ventilation And Cooling) System
Rfq: Hvac Repairs For The Un House Lesotho – Floor 2 & 3
Publish Names Of Bidders - The Provision And Maintenance Of Hvac&R (Heating, Ventilation, Air Conditioning And Refrigeration) For Plant Systems And Equipment At Koeberg Operating Unit As Well As All Chillers Systems For 5 Years On An As And When Required Basis
Contractor For The Replacement Of Hvac Equipment At O. R. Tambo International Airport For A Period Of Two (2) Years
Preventive Maintenance Of Hvac & Potable Water Systems
Tender Notice About The Facility Renovation And Installation Of Hvac System
Provision Of Annual Maintenance For Data Centre Facility Hvac System For A Period Of Two (2) Years
Tender Validity Extension - The Provision Of Hvac Systems Maintenance Services Required For Property Management Department By A Panel Of Two (2) Contractors On An “As And When” Required Basis In The Central East Cluster – Kwazulu Natal Operating Unit For A Period Fifty-Three (53) Months.
The Appointment Of A Suitable Civil And Structural Firm Within The Built-Environment For The Design And Construction Of Kzn Department Of Health: Greys Hospital Restoration Of Hvac System Phase 01 – Theatre Complex
The Appointment Of A Suitable Electrical Engineering Firm Within The Built-Environment For The Design And Construction Of Kzn Department Of Health: Greys Hospital Restoration Of Hvac System Phase 01 – Theatre Complex
The Appointment Of A Suitable Civil And Structural Firm Within The Built-Environment For The Design And Construction Of Kzn Department Of Health: Greys Hospital Restoration Of Hvac System Phase 01 – Theatre Complex
The Appointment Of A Suitable Electrical Engineering Firm Within The Built-Environment For The Design And Construction Of Kzn Department Of Health: Greys Hospital Restoration Of Hvac System Phase 01 – Theatre Complex
Maintenance Services for Data Centre Facility HVAC System for a Period of Two (2) Years
The Replacement Of The Heating, Ventilation And Airconditioning (Hvac) System And The Roof Waterproofing, At The Ikhwezi Building In New Germany, Kzn Operating Unit, Central East Cluster, For A Period Of Eight (8) Months.
The Replacement Of The Heating, Ventilation And Airconditioning (Hvac) System And The Roof Waterproofing, At The Ikhwezi Building In New Germany, Kzn Operating Unit, Central East Cluster, For A Period Of Eight (8) Months.