1878 Live Notices for Asia Pacific Drilling Tenders
Showing 1 to 20
Cloth Cotton Drill Olive Green Material
Construction Of Additional Class Room Brahmangaon Gps Under Pedp4 Under Keraniganj, Dhaka.
Construction Of Boundary Wall & Gate Of Hossain Pur Gps.
1) Construction Of Head Teacher'S Room With Attached Toilet Of Palashihata Gps Under Pedp4. 2) Construction Of Head Teacher'S Room With Attached Toilet Of Vatipara Balashor Gps Under Pedp4. 3) Construction Of Head Teacher'S Room With Attached Toilet Of Kali Bazail Gps Under Pedp4.
Improvement Of 2221.00M Road In 02 Locations By Dbc, 750.00M Drain In 01 Location By Rcc, 1 No Rcc Box Culvert, 7 Nos Rcc Cross Drain And 76 Nos Street Light, Protection Work 498.00M Including 450 Nos Tree Plantation At Sonagazi Pourashava Under Feni District.
Rdirwsp/Sir/Chow/R-19 Widening & Strengthening Of Upazila H/Q-Nagorpur Thana Boarder Road At Ch.00-4410M Under Chowhali Upazila, District: Sirajganj. [Road Id: 188272001] [Total Cost Of Salvage: Tk.1446983.00]
Upgrading Of Uni Block Road At (1) Munjilgacha Hafiziya Madrasa To Upozilla Prani Sompod Office , Ward No.-03, Ch. 0.00-340.00M, (2) Naldanga Sonapatil Mr. Helal House To Mr. Local Thakur House, Ch. 0.00-580.00M, Ward No.-03,05, Under Naldanga Pourashava, Natore.
Upgrading Of Uni Block Road At Kuturipara Mr. Lalchand To Burirbhag Mr. Dulal House, (Ch. 0.00-930.00M) Ward - 09 Under Naldanga Pourashava , Natore.
Upgrading Of Uni Block Road At Naldanga Main Bazar Area Internal Road, Ward No.-03, 04 (Ch. 0.00-1150.00M) Under Naldanga Pourashava , Natore.
Construction Of 06 Nos Single Storied Rcc Wash Block At Different Upazila Of Moulvibazar District Under Need Based Infrastructure Development Of Government Primary Schools (Phase-1).
Construction Of 05 Nos Single Storied Rcc Wash Block At Different Upazila Of Moulvibazar District Under Need Based Infrastructure Development Of Government Primary Schools (Phase-1).
Construction Of 06 Nos Single Storied Rcc Wash Block At Different Upazila Of Moulvibazar District Under Need Based Infrastructure Development Of Government Primary Schools (Phase-1).
E-Tender/Pedp4/Cml/Lak/2024-25/Pedp4/W15A.00959 1) Construction Of Head Teacher'S Room With Attached Toilet Of Alaice Gps Under Pedp4 2) Construction Of Head Teacher'S Room With Attached Toilet Of Azgora Gps Under Pedp4 3) Construction Of H.
Repair And Maintenance Work Of University Main Gate And Guard Room At Pstu
Construction Of 07 Nos Single Storied Rcc Wash Block At Different Upazila Of Moulvibazar District Under Need Based Infrastructure Development Of Government Primary Schools (Phase-1).
E-Tender/Pedp4/Cml/Lak/2024-25/Pedp4/W15A.00958 1) Construction Of Head Teacher'S Room With Attached Toilet Of Uttarkul Gps Under Pedp4 2) Construction Of Head Teacher'S Room With Attached Toilet Of Paschim Gaon Adarsha Gps Under Pedp4
Repair And Maintenance Work Of Student Hall Male & Female For Faculty Of Ansvm.
E-Tender/Pedp4/Cml/Lak/2024-25/Pedp4/W15A.00957 1) Construction Of Head Teacher'S Room With Attached Toilet Of Cikunia Gps Under Pedp4 2) Construction Of Head Teacher'S Room With Attached Toilet Of Sriang Gps Under Pedp4
Repair And Maintenance Works Of Academic Building Block A,B,C&D At Pstu.
Upgrading And Rehabilitation Of Dbc Road From Mirpur Pasu Hat Rail Gate To Khondokbaria Shohidul House, Ward No-09, (Ch 0.00-560.00+10.00+1010-1130=690M), (Salvage Cost Tk. 139795.00) Under Mirpur Paurashava, Kushtia. Package No.: Lgcrrp/Mirpur/2024-25/W-07