16 Live Notices for Asia Pacific Sleepers Tenders
Showing 1 to 16
23 Purchases Including Synthetic Sleepers
Providing Composite Sleepers And Synchronized Accessories In 2024
Shop Crushed Stone 2.5X5 Cm; Tn1 Prestressed Concrete Sleepers; Records For Regular Maintenance Of National Railway Infrastructure In 2024
Procurement Of Composite Bridge Sleepers For Regular Maintenance Of National Railway Infrastructure In 2024
Bidding For Construction Work, Production Or Supply Of Steel Sleepers Along With Replacing Wooden Sleepers On The Steel Bridge In Use At Km. 1040+000 - 1144+380 In The Area Of Bamrung Thanyong Mas Subdistrict, 21 Places, 1,723 Sections In The Southern Line, Bamrung Subdistrict Yong Mas Dead End Hat Yai District Road Maintenance Division By Means Of Electronic Bidding
Bidding For Construction Work, Production Or Supply Of Shaped Steel Pillows Ready To Replace The Wooden Sleepers On The Steel Bridge. And Raising And Leveling Bridges On The Northern Railway Lampang District Road Maintenance Division, 10 Sections, 1 Area In Phrae Province, By Means Of Electronic Bidding.
Bidding For Construction Work, Production Or Supply Of Steel Sleepers Along With Replacing Wooden Sleepers On The Steel Bridge In Use At Km. 1040+000 - 1144+380 In The Thanyong Mas Subdistrict, 21 Locations, 1,723 Sections, Hat Yai District Road Maintenance Division Southern Maintenance Center Civil Engineering Department By Means Of Electronic Bidding
Modernization And Purchase Of Furniture For Vasa Shohid Rafiq Uddin Ahmed Library And Memorial Museum Under Singair Upazila.
Kcc/Won/Xen-C/2024-25/G-02 Solid Waste Management At 10 No Ward (2024-25)
Psc Sleepers 60 Kg. As Per Drg. No. T-2496 Quantity: 21960
Manufacture And Supply Of Fittings Thick Web Switch For 1 In 12 Turnout Bg (1673Mm) For 60 Kg On Psc Sleepers To Rdso Dr.
Re-Invitation - Replacement & Stacking Of Broken/Notched And Released Sleepers In Yard Using 8.0 Tonne Tracked Excav.
Re-Invitation - Replacement & Stacking Of Broken/Notched And Released Sleepers In Yard Using 8.0 Tonne Tracked Excav.
Bg Through Turnout Renewal (With Sleepers) 1 In 12 & 1 In 8.5 (Xing & Switches) At Phi= 4 Sets (Point No. 103B, .
Manufacture And Supply Of Metal Liner Conforming To Rdso Drg. No T-8748 For Use With Wider Psc Sleepers Suitable For 60K.
Supply Of Sign Boards And Office Seal For Fy 2024-2025