1095 Live Notices for APEC Auditing Services Tenders
Showing 1 to 20
Supply And Installation Of Equipment
Package No. 15.Tcxl.25: Construction And Installation, Supply Of Materials And Equipment For The Project "Xdm, Tccs Public Transformer Station Supplying Electricity To Customers In The Areas Of Tan Thanh Dong, An Nhon Tay, Phu My Hung, Nhuan Duc, Phuoc Vinh An Communes In 2024 - Mct: F05F05.Lt0M.24016"
Package No. 18.Tcxl.25: Construction And Installation, Supply Of Materials And Equipment For The Project "Building And Installing Public Transformer Stations To Supply Electricity To Customers In Hoa Phu, Trung An, Tan Phu Trung, Phu Hoa Dong, Tan An Hoi, Phuoc Hiep Communes In 2024 - Mct: F05F05.Lt0M.24018"
Package No. 16.Tvgs.25: Construction Supervision Consultancy For The Project "Xdm, Tccs Public Transformer Station Supplying Electricity To Customers In The Area Of Tan Thanh Dong, An Nhon Tay, Phu My Hung, Nhuan Duc, Phuoc Vinh An Communes In 2024 - Mct: F05F05.Lt0M.24016"
Package No. 19.Tvgs.25: Construction Supervision Consultancy For The Project "Xdm, Tccs Public Transformer Station Supplying Electricity To Customers In Hoa Phu, Trung An, Tan Phu Trung, Phu Hoa Dong, Tan An Hoi, Phuoc Hiep Communes In 2024 - Mct: F05F05.Lt0M.24018"
Package 03: Purchase Of 04 87L Relays Suitable For The Existing Operating System
Project Audit
Package 4: Construction
Package No. 15: Supply 01 Wheel Loader, Tire, Bucket Capacity ≥6 M3
Package No. 06 Construction Of Works
Bidding For The Rental Of A 12-Seat Passenger Car (Van) Under The Project To Inspect Operations And Disbursement Of Funds For The Management Of Foreign Workers Of The Internal Audit Group, 1 Vehicle, By Electronic Bidding Method.
Construction
Package No. 04: Construction
Construction
No. 06: Construction And Ensuring Traffic Safety For Construction
Package No. 03: Construction Works (Including Construction Insurance)
Total Volume Of Construction And Installation Of Construction Equipment
Package Tv10: Supervision Consultancy For Package Xl01
Contractor Selection Plan For Van Phuoc Vien Cemetery Park Project - Phase 1 (Scale 5.82Ha)
Building Software To Publicly Disclose Audit Reports