6212 Live Notices for APEC Meters Tenders
Showing 1 to 20
66--Meter,Salinity Indi, In Repair/Modification Of
66--Water Flow Meter
purchase and installation of ultrasonic flow meters for pipe-mounting and permanent burial
hiring of maintenance and improvement of flow meters in the water loss monitoring system (Group 4)
50Mm Water Meter Service Setters
Cfi: Water Chemistry Research Systems
Detector Of Audio And Visual Alert Detector For Signals Emitted By Advanced Driv
Rfp - Supply And Install Of A Hydrogen Flow Metering Test Bench
Meter, Flow Rate Indicating
50Mm Water Meter Service Setters
Laja Green Areas Maintenance Service
2024-466T - Clarkson Wastewater Resource Recovery Facility (Wrrf) Plant 1 Diffuser And Expansion Joint Replacement, Project 24-2938
Rfq 25-0023 - Hampton Village Business Park (Hvbp) Storm Pond And Storm Trunk Sewer
Hiring For Construction Work On Improving The Water Supply System And Buildings In Fiscal Year 2025 (Government Subsidy) Construction Of A 1,000 Cubic Meter Clear Water Tank, Construction Of A Water Pumping Station, And Installation Of A Water Pump At The Pa Sak Water Distribution Station, Phan Phrao Subdistrict, Sri Chiang Mai District, Nong Khai Province, Sri Chiang Mai Provincial Waterworks Authority
Construction Of A 200 Cubic Meter/Hour Water Production System, Provincial Waterworks Authority, Uthai Thani Branch (Taluk Du Service Unit), Including Laying Of Pipelines And Distributing Water To Taluk Du Subdistrict, Thap Than District, Uthai Thani Province.
Procurement Of 1 Portable Ultrasonic Flow Meter (Portable Ultrasonic Flow Meter)
Project To Improve The Production System From 500 Cubic Meters/Hour To 1000 Cubic Meters/Hour And Lay Water Distribution Pipes At Phra That Pha Daeng Water Production Station, Mae Sot Provincial Waterworks Authority, Phra That Pha Daeng Subdistrict, Mae Sot District, Tak Province
Chiang Mai Province Announcement On The Bidding For The Construction Of A 10-Storey Car Park Building At Nakornping Hospital, Don Kaeo Subdistrict, Mae Rim District, Chiang Mai Province, Usable Area Approximately 16,603 Square Meters (Earthquake-Resistant Structure), 1 Building, By Electronic Bidding (E-Bidding)
Term Contract For Fixing, Changing And Removal Of Water Meters (West) And Servicing Of Meter Interface Unit For Year 2025 To 2027
Bituminous Rehabilitation Pr 224 Pr 325 – Fisher Bay