Summary:
1.1.1. Works On The Improvement Of The Road Passing Through The Territory Of The Former Gonio Farm In Batumi (Second Stage) And The Construction Of A Retaining Wall On The Mejinistskali River In Batumi, From Mikheil Sharashidze Street To The First Dead End Of Mikheil Sharashidze. Country:
Georgia Estimated Cost:
GEL 4882547 Notice Type:
Tender Notice Deadline:
25 Dec 2024 Posting Date:
04 Dec 2024 |
Summary:
1.1.1. Improvement Works On I. Meskhi Street In Batumi. Country:
Georgia Estimated Cost:
GEL 4621693 Notice Type:
Tender Notice Deadline:
25 Dec 2024 Posting Date:
04 Dec 2024 |
Summary:
In Batumi, Maintenance Works Of Road Infrastructure (Sidewalk, Curb, Paving, Bodzkinti). Country:
Georgia Estimated Cost:
GEL 789800 Notice Type:
Tender Notice Deadline:
20 Dec 2024 Posting Date:
30 Nov 2024 |