751 Live Notices for Asia Highway Construction Tenders
Showing 1 to 20
Package No. 19: Construction Of Road Works Connecting Provincial Road 163 With Noi Bai - Lao Cai Highway (Item: 02 Branch Routes)
Announcement On The Change Of Construction Project Of Mi5-Line Tourist Highway Tunnel In Jiaocheng County Trading Place: Luliang City 2025/02/26
Guangdong Putai Construction Consulting Co., Ltd.’S 2024 Highway Maintenance Service Project (Section I) In Xiangtang Town (Project Number: Gdptjx-202.
Public Tender Announcement Of The Restaurant Renovation Project Of The Highway Traffic Testing Ground Of The Ministry Of Transport Highway Science Institute
Tv01: Survey Consultancy, Construction Drawing Design
Earth Work, Construction Of Flexible Pavement, Rcc Box Culvert (06 Nos) & Bridge (2 Nos), Drain And Protective Work From 27Th (P) Km (Ch.26+890 M) To 36Th (P) (Ch. 35+350 M) Km Of Bhulta-Araihazar-Bancharampur-Nabinagar-Shibpur-Radhika R-203, .
Earth Work, Construction Of Flexible Pavement, Rcc Box Culvert (05 Nos) & Bridge (2 Nos), Drain And Protective Work From 20Th (P) Km (Ch.19+880M) To 27Th (P) (Ch.26+890M) Km Of Bhulta-Araihazar-Bancharampur-Nabinagar-Shibpur-Radhika R-203, (Ko.
Repair & Construction Of Damaged Shoulder By Flexible Pavement At10Th(P) Km (Ch. 09+730M To 09+810M) L/S And 10Th Km (Ch. 09+730M To 09+820M) R/S Of Chattogram (Oxygen)-Rangamati (Hathazari) National Highway (N-106) Under Chattogram Road Division During The Year 2024-2025.
Construction Of Hard Shoulder At Janker Moor Portion 16Th(P) Km. (Ch: 15+170M To 15+280M) R/S, At 16Th Km. (Ch: 15+310M To 15+400M) L/S Of Hathazari-Fatikchari-Manikchari-Matiranga-Khagrachari Regional Highway (R-160) Under Chattogram Road Division During The Year 2024-2025.
Re-Construction Of Rcc Box-Culvert (1 X 2.00M Span, 2.00M Height) At 8Th (P) Km Ch. 7+760 Km Of Barabari Lalmonirhat-Burimari Road (N-509) National Highway Road Under Road Division Lalmonirhat During The Year 2024-2025.
Re-Construction Of Rcc Box-Culvert (1 X 4.00M Span, 2.50M Height) At 18Th(P) Km Ch. 17+290 Km Of Barabari-Lalmonirhat-Burimari Road (N-509) National Highway Road Under Road Division Lalmonirhat During The Year 2024-2025.
Earth Work, Construction Of Flexible Pavement, Rcc Box Culvert (9 Nos) & Bridge (1 Nos), Drain And Protective Work From 36Th (P) Km (Ch.35+350M) To 41St (P) (Ch. 40+280 M) Km Of Bhulta-Araihazar-Bancharampur-Nabinagar-Shibpur-Radhika R-203, (K.
Construction Of 2Nd & 3Rd Floor Remaining Work (Civil, Sanitary, Electrical, Internal Road, Sentry Box And Saluting Dice) Of Pangsha Highway Thana (Rajbari) Having 06 Storied Foundation Under Highway Police Madaripur Region, Faridpur.
Construction And Installation No. 02
Package 03: Consulting On Designing Construction Drawings - Estimates
Announcement On The Winning Results Of The Preliminary Work Of The New Project Planning Of The Old Quli To Qu And The Provincial Road Network
Announcement On The Competitive Consultation Of The Precautionary Maintenance Project Of The Nalati Maintenance Center Of Yili Highway Development Center In 2025 G217 Line Yuximolege Tunnel
Repair Of Pavement From Maintenance During Construction Of The Project "Kashinathpur- Dasuria- Natore- Rajshahi- Nawabgonj- Kansat-Sona Masjid- Baliadighi Border Road (N-6)" Under Rhd Road Division Chapainawabganj In The Year 2024-2025 (Wp-05).
Package No. 02: Construction Construction
Construction Rcc Box Culvert (1 X 2.00M X2.00M) At Ch:425+598 Of Dhaka (Jatrabari)-Cumilla (Moinamoti)-Chattogram-Cox'S Bazar-Teknaf National Highway (N-1) Under Cox'S Bazar Road Division During The Year 2024-2025.