15204 Live Notices for Asia Installation Work Tenders
Showing 1 to 20
Package Xl-04: Construction Of Battalion 3 Items (Company 9 Housing, Company 9 Dining Hall, Toilets, Company 9 Drying House, Company 9 Area Infrastructure)
Package No. 24: Construction And Installation Of Schools In Tri Ton Town
Package Xl-05: Construction Of Battalion 3 Items (Battalion Area Leveling, Main Gate, Concrete Road, Battalion Area Concrete Yard, Sidewalk, Battalion Area Fence, Outdoor Electrical System, Outdoor Water Supply System, Fire Protection System, Clean Water Supply Station, Livestock And Farming Area; Battalion Dining Hall)
Adjusting The Contractor Selection Plan For The Project Implementation Phase (Package: Construction Supervision And Equipment Installation) Project: Preventing Overload Of The Distribution Grid In Go Cong Dong District (Phase 2)
Purchase And Installation Of 32-Slice Computed Tomography (Ct) Scanner For Nghia Hung District Medical Center
Purchase And Install Outdoor Sports Equipment For Sports Areas (01 Ttvh, 14 Tdp) In Hop Chau Town, Tam Dao District
Contractor Selection Plan Estimate: Purchase And Installation Of Air Conditioning System At 15 Nguyen Dinh Chieu
Install Additional Soft Guardrails On The Connecting Road From The Center Of Na Ri District Of Bac Kan Province To Binh Gia District And Trang Dinh District Of Lang Son Province, Through Xuan Duong Commune, Na Ri District.
Supply And Installation Of Shelves, Doors, Aluminum And Glass Walls For Departments: Testing, Infection Control, Intensive Care - Anti-Poison, Pharmacy And Medical Equipment Room
Installation Of Pure Water Filtration System For Aircraft At Phu Bai International Airport
Approval Of The Plan To Select A Contractor To Install The Lighting System On The Bon Mieng - Kenh Ranh Route, Binh Hang Trung Commune.
Supply And Installation Of 06 Air Conditioners At The Tax Department Of Ben Tre - Chau Thanh Area, Tax Department Of Mo Cay Nam - Thanh Phu Area Under The Tax Department Of Ben Tre Province
Construction And Installation: Upgrading And Expanding 3.5M-3.75M Roads To 5.5M Roads Without Ensuring The Remaining Sidewalk Is At Least 2M In The District.
Bidding Packages Under The Project'S Economic - Technical Report: Installation Of Automatic Traffic Control Signals At Intersections: Nguyen Phong Sac Street With Duong Dinh Nghe Street, Que Vo Town; Highway 17 Bypass With Highway 283, Thuan Thanh Town, Bac Ninh Province
Theater And Stage Installation, Table And Chair Rental
Construction And Installation Of Billboards To Promote Environmental Protection And Climate Change
Supply And Installation Of Sound Systems
Contractor Selection Plan For The Package: Procurement And Installation Of Air Conditioners For The Office Of The People'S Committee Of Bac Son Commune
Procurement Budget: Supply And Installation Of Elevator Cables At The Central Maternity Hospital
Camera System Installation