126 Live Notices for Australia Sleepers Tenders
Showing 1 to 20
Design And Execution Of Works For The Project Entitled: "Creation Of The Łomża - Białystok Communication Route Through Revitalization And Electrification Of Railway Line No. 49 Łomża - Śniadowo And Electrification And Reconstruction Of Passenger Service Infrastructure On Railway Line No. 36 On The Śniadowo - Łapy Section". The Full Name Of The Procedure Can Be Found In Section 2.1 In The "Description" Field.
Tender Notice From: Head Of Economic Affairs Of The Land Force. Purpose: Supply Of Construction Materials For The Pczurb Extension. Casas Altas Phase 4.1 And Phase 4.2 Cenad San Gregorio (Zaragoza). "Adaptation Of The Station, Platforms And Train Tracks In Pczurb Casas Altas". File: 2024/Etsae0206/00001320E.
Systematic Maintenance - Package 1: Road Maintenance Work
Purchase Of Impregnated Wooden Sleepers (Type 1-2, 230X160X2750, 51400 Pcs.) For The Needs Of The Kalmakyr Mining Administration Of Almalyk Mining And Metallurgical Company Jsc
Replacement Of Individual Sleepers Of The Narrow Gauge Railway Track (750 Mm) Panevėžys - Rubikiai
Execution Works Of The Project To Replace Sleepers And Rail On Line 700 Casetas – Bilbao, Sub-Section Castejón De Ebro – Irún Headquarters Limit From Km 1+260 To Km 81+600.
Works To Replace Sleepers And Rail Line 700 Casetas – Bilbao. Cortes De Navarra – Castejón De Ebro Subsection From P.K 53+400 To P.K 93+006 On Double Track.
Upgrading Of Rin Routes 6751+6938+6946 For Hvac Logistics Traffic - Sleeper Delivery
Execution Works Of The Project To Replace Sleepers And Rails On Line 700 Casetas – Bilbao, Sub-Section Castejón De Ebro – Limit Of The Irún Headquarters From P.K 1+260 To P.K 81+600.
Works To Replace Sleepers And Rail Line 700 Casetas – Bilbao. Cortes De Navarra – Castejón De Ebro Subsection From P.K 53+400 To P.K 93+ 006 On Double Track.
Research Project - Dzsf - Track-Bridge-Interaction (Trabi)
Manufacturing, Supplying & Fitting Of Furniture Under The Project "Strengthening And Capacity Building Of Srdi At Dhaka".
Renovation Of Walkway And Jetty With Allied Works At Dhuliya Launch Ghat Under Biwta, Patuakhali Division, Patuakhali.
Research Project - Dzsf - Track-Bridge-Interaction (Trabi)
"Winter Maintenance And Snow Removal Of Municipal Roads And The Street Network In The Municipality Of Ugarchin" Under Two Separate Positions
The Service Of Providing (Outsourcing) 5 Mahals Of Heating To Sleepers
Delivery Of Wooden Sleepers And Turnout Sleepers For 2025-2026
Materials Supply Market For The Regeneration Project Of Railway Line No. 356 000 Between Rouxmesnil-Bouteilles And Penly (76)
57/52/3/24/012 - Renewal Of The Central Bundle In Merelbeke Phase 1
"Delivery And Commissioning Of 1 Set Of Special Machines For Optional Work. Road With A Distance Of 1435 Mm, Comp. From Ballast Screening Mash., Planning Mash. And Traversing Mash. For Strengthening On 2 Pcs. Duomatic Sleepers With Cyclic Movement. During Work Percent And Those Related To Mung Bean. Additional Equipment, Consumables, Special Tools, Technical Documents And Documents For Maintenance And Repair Work"