Similar tenders from other countries.
Showing 1 to 20
Acquisition Of Structural Design Services Related To Helen Group'S Power Plants, Thermal Centers, Substations And Real Estate
Demolition/New Construction Pu + Platforms Vst Themar
B 294 - Kirchberg And Schlossberg Tunnels, Retrofitting
Center Maintenance, Operations, And Engineering Extension
E36 Air Treatment Rock Plant Kongshaugen
600791 Kongsvingerbanen Seterstøa Plan Transition - - Procurement Execution Contract
Contractor Selection Plan For The Preparation Phase Of The Long Phuoc Tunnels Relic Exhibition Area Project
Treatment Of Infiltrations And Repair Of Coatings On The Metro - Rer & Tramway Networks
E36 Air Treatment Rock Plant Kongshaugen
600791 Kongsvingerbanen Seterstøa Plan Transition - - Procurement Execution Contract
Vs Weissenbühl, New Building, Bkp 211 Construction Work
Development, stonework, corniche, afforestation and lighting of Al-Hajer Canal From Al-Hayar Bridge to the city entrance, 1 km long
Construction Of A Central Vacuum System At The Animex K4 Plant
B 294 - Kirchberg And Schlossberg Tunnels, Retrofitting
Mainnetzausbau Süd A160 Griesheim-Schwanheim Specialist Planner Tunnel And Underground Cable
Tender Notice From: Adif Alta Velocidad - Presidency. Purpose: Consultancy And Assistance For The Control Of Works On Construction Projects On The Madrid-Galicia High-Speed Line, Section: Pedralba-Orense, For The Installation Of Aerodynamic Fins On Bird Strike Protection Barriers, Widening Of Evacuation Corridors In Several Tunnels And Execution Of Acoustic Protections. Campobecerros. File: 3.24/20830.0199.
Execution Of The Works For The Infrastructure Treatment Project For Tunnel No. 52 In Ascó. Line 210 Miraflores – Sant Vicenç De Calders. Section Caspe – Mora La Nova And Execution Of The Works For The Infrastructure Treatment Project For Tunnel 68 In Capçanes. Line: Miraflores – Tarragona. Section: Mora La Nova – Reus.
I/33 Náchod - Bypass
Construction Of A New Radom Południowy Stop At L. K. No. 8 And 22” As Part Of The “Governmental Program For The Construction Or Modernization Of Railway Stops For The Years 2021–2025” And Execution Of Works For The Task: “Expansion Of The County Road – Ul. Walentynowicz In Radom Consistent With The Construction Of A Pedestrian Bridge Over The Southern Bypass
D1 Turany - Hubová