12 Live Notices for Bangladesh Concrete Tenders
Showing 1 to 12
Repair Of Rigid Pavement At 5Th Km (P) & 450.00M Concrete Slope Protection Including Earth Work Of Lakhai Thana Head Quarter (Kalauk) - Lakhai Bazar (Z-2404) Road Under Road Division, Habiganj During The Year 2024-2025.
Operation & Maintenance And Supply Work Of Necessary Equipment & Tools Of Zonal Soil And Concrete Laboratory Of Office Of The Additional Chief Engineer, Northern Zone, Bwdb, Rangpur, Under Rangpur O&M Division During The Fiscal Year 2024-2025.
O & M Of Hazrat Shahjalal International Airport, Kurmitola, Dhaka During The Year 2023-2024 (S.H:-Runway, Taxiway And Apron-Providing Lean Mix Concrete In Between Baf Connecting Taxiway And Peripheral Road From Baf North Alpha Ch. 1180'-0" T.
Construction Of F-Type Residential Building At Township Area Of Matarbari Coal Based Power Plant Under Civil Works (Residential-Building) Package, Includes: (I) Piling Works; (Ii) Reinforce Cement Concrete (Rcc) Works; (Iii) Brick Work.
Construction Of C-Type Residential Building At Township Area Of Matarbari Coal Based Power Plant Under Civil Works (Residential-Building) Package, Works Includes: (I) Piling Works; (Ii) Reinforce Cement Concrete (Rcc) Works; (Iii) Bric.
Construction Of E-Type Residential Building At Township Area Of Matarbari Coal Based Power Plant Under Civil Works (Residential-Building) Package, Includes: (I) Piling Works; (Ii) Reinforce Cement Concrete (Rcc) Works; (Iii) Brick Work.
Construction Of B-Type Residential Building At Township Area Of Matarbari Coal Based Power Plant Under Civil Works (Residential-Building) Package, Includes: (I) Piling Works; (Ii) Reinforce Cement Concrete (Rcc) Works; (Iii) Brick Work.
Retrofitting Work In 42.2M Long Rcc Bridge (Lalpool Bridge) Including Immediate Temporary Support System, Fire Affected Concrete Repairing , Replacement Of Fire Affected Expansion Joint & Bearing Plate At 225Th Km (Ch: 224 Km + 597M) O.
Retrofitting Work In 42.2M Long Rcc Bridge (Lalpool Bridge) Including Immediate Temporary Support System, Fire Affected Concrete Repairing , Replacement Of Fire Affected Expansion Joint & Bearing Plate At 225Th Km (Ch: 224 Km + 597M) O.
Construction Of 283.188 M (7 X 39.634 M) Long Pc Grider Bridge At 8Th Km (Ch. 7 +892 Km, Barungka Bridge) Of Niamatpur-Tahirpur (Z-2806) Road Including Construction Of Approach Road, Rcc Drain, Concrete Slope Protection With Cc Block, Rcc Retainin.
Reconstruction Of Flexible Pavement From 1St To 10Th Km (Ch. 0+100 To 9+300 Km) And 22Nd Km(Ch. 21+400 To 22+00 Km) Of Gobindaganj-Chhatak-Dowarabazar (Z-2802) Road Including Earthwork, Construction Of Bus-Bay, Intersection, Footpath Cum Drain ,Co.
Construction Of 4-Lane Rigid Pavement From 10Th Km To 13Th Km (Ch.9+300 To 13+000 Km) Of Gobindagonj -Chhatak-Dowarabazar (Z-2802) Road Including Construction Of Median, Bus-Bay, Intersection, Footpath Cum Drain, Earthwork, Concrete Slope Protecti.