46 Live Notices for Bangladesh Meters Tenders
Showing 1 to 20
Construction Of 02(Two) Meter Height Retaining Wall With Slope Protection At 10Th Km (P), 15Th Km (P), 17Th Km (P) & 18Th Km (P) Of Jagodishpur-Chunarughat-Shaistaganj (N 204) Road Under Road Sub-Division Shaistaganj Of Road Division Habiganj During The Year Fy- 2024-2025
Construction Work Of 02(Two) Meter Height Retaining Wall With Slope Protection At 17Th Km (P) (Ch. 16+291 To 16+338M) Of Ramgonga Bridge Approach & Embankment Damaged Due To Flood Of Jagodishpur-Chunarughat-Shaistaganj (N 204) Road Under Road Sub-Division Shaistaganj Of Road Division Habiganj During The Year Fy- 2024-2025
"Procurement Online Analyzer Meter, Measuring Ph & Conductivity Of Dm Water Process"
Repair & Maintenance Of Water Supply Line In Jetty Area For The Fy 2024-2025
Construction Of 04 Nos Bridges (1) 34.88 Meter (1X33.54 M) Long P.C. Girder Bridge At 49Th Km (Ch:48+825 M), (2) 34.88 Meter (1X 33.54 M) Long P.C. Girder Bridge At 53Th Km (Ch:52+155 M), (3) 19.64 Meter (1X 18.30 M) Long Rcc Girder Bridge At 54Th.
Supply, Installation And Commissioning Of Insertion Type Electromagnetic Flow Meter At Janapath Mor Of Swtp Transmission Network.
Otm-Bog/W-112/2024-25 Construction Of Ramp Work Meter.230.000 To Meter.450.000=220.00 M Length At Baniajan Spur Located Of Bre Embankment At 137.700 Km Upazila Dhunat District Bogura Under Bogura Wd Division,Bwdb,Bogura In The Fy 2024-25.
Otm-Bog/W-100/2024-25 Repair And Maintenance Work Of 750 Meters Of Alternative Embankment Between Hasnapara Spur-1 And 2 Of Sariakandi Upazila Of District Bogura Under Bogura Wd Division, Bwdb, Bogura In The Fy 2024-25.
Construction Of 1000 Meter Burried Pipe Line With The Supply Of Upvc Pipe Of 315 Mm Dia.
Extension Of 500 Meter Burried Pipe Line With The Supply Of Upvc Pipe Of 250 Mm Dia
Extension Of 500 Meter Burried Pipe Line With The Supply Of Upvc Pipe Of 250 Mm Dia.
Construction Of 2.50 Meter Height Rcc Retaining Wall And Reconstruction Of Damage Road At 22Nd Km Of Kulaura-Shemshernagar-Sreemangal Road (Z-2003) Road And 23Rd Km Of Moulvibazar-Shamshernagar-Chatla Check Post (Z-2002) Road Under Moulvibazar Road Division During The Year 2024-2025
Pilot Balloon Theodolite With Tripod
Mym/Ndr/2024-25/Ishwarganj-01 Precautionary Protective Work Along The Left Bank Of Old Brahmaputra River From Km.64.890 To Km. 64.940 = 50.00 Meter At Bottala Munsibari Moor In Upazila Ishwarganj Dist:Mymensingh Under Mymensingh Wd Division, Bwdb, Mymensingh During The Year 2024-2025.
Mym/Ndr/2024-25/Nitai-02 Precautionary River Bank Protective Work With Sand-Cement-Gunny Bags To Protect Gamaritola Settlement Project Along The Left Bank Of Nitai River From Km 0.090 To Km 0.160 =70.00 Meter In C/W Nitai River Sub-Project Und.
Mym/Ndr/2024-25/Chatugaon-01 Repair & Maintenance Of Irrigation Drain Of Chatugaon Pump House Total 400.00 Meter In Between Km 0.800 To Km.1.800 In C/W North Mymensingh Deep Tube-Well Project Under Ndr Budget At Haluaghat Under Mymensingh .
Bsl/Ndr/2024-25/W-12 Precautionary Bank Protection Work To Protect Badolpara School Bazar Area Of Choramoddi Union From Erosion Of Rangamati River From Km. 0.000 To Km. 0.122; Total 122 Meter Of Bakerganj Upazila In B.
Bsl/Ndr/2024-25/W-15 Repair Of River Bank Protection Work From Erosion Of The Arial Khan River From In Between Km. 0.450 To Km. 0.630; Total 25.00 Meter At Hosnabad Bazar, Launch Ghat & Adjacent Area In Gournadi Upazilla Under Barishal Wd Division, Bwdb, Barishal During The Year 2024-2025.
Supply And Installation Of 8 (Eight) Nos Ltct (3 Phase, 200/5 Amp Full Set) Energy Meter At Different Dtw Compound Under Mods Zone-3, Dhaka Wasa.
Procurement Of Tele Pre-Paid Meter And Mobile Vending Unit With Necessary Accessories.