Similar tenders from other countries.
Showing 1 to 20
Rehabilitation Of The Ternay Medical Center Into A Health Center For Technical Lots: 12, 13, 14, 15
Restructuring And Extension Of The Roquettes School Group
Announcement By The Department Of Industry And Energy Of The Government Subdelegation In Palencia, By Which The Request For Recognition, Specifically, Of Public Utility Of The Photovoltaic Solar Installation "Fv Herrera Solar 3-4", Of 89.985 Mw Of Peak Power And 81.2 Mw Of Installed Power And Its Evacuation Infrastructure, In The Municipalities Of Sotobañado And Priorato, Páramo De Boedo And Calahorra De Boedo, In The Province Of Palencia, Is Submitted To Public Information.
Announcement By The Department Of Industry And Energy Of The Government Subdelegation In Valladolid, By Which The Request For Recognition, Specifically, Of Public Utility Of The "Los Quincetos" Photovoltaic Solar Installation Of 56.51 Mw Of Peak Power And 50.1 Mw Of Installed Power, And Its Evacuation Infrastructure, In The Municipalities Of Marzales, Mota Del Marqués And Vega De Valdetronco, In The Province Of Valladolid, Is Submitted To Public Information.
Awarding Of The Implementation Of Detailed Analyses And The Installation Of Photovoltaic Systems And Battery Storage Systems On Or In Bima Buildings
Ordinary And Possible Extraordinary Maintenance Service Of Electrical And Photovoltaic Systems For The Year 2025/2026
Project Management For The Rehabilitation Of Flat Roofs At The Pasteur Primary School And Installation Of Photovoltaic Solar Panels
Construction Of A Self-Consumption Photovoltaic Power Plant On The Buildings Of The Chiconi And Sada Colleges.
Provide Prime Power, Soto Cano Air Base (Ab), Honduras
Annual Sectoral Procurement Program For The Year 2024 Version 30.10.2024/Procurement Program For The Project "Modernisation Of 55 Electric Locomotives Intended To Tow Passenger Trains, Conversion Of 20 Hydraulic Diesel Switching Locomotives Into Electric Locomotives With Battery And Modernization Of 139 Wagons Travelers" Financed Through Pnrr, Component 4 Sustainable Transport, I2-Rail Rolling Stock, For The Period 2023-2026-Centralization On Cpv Codes
Contracting Of Maintenance Services For Photovoltaic Equipment In Public Buildings
Design And Construction Of A Photovoltaic Farm
Construction Of Two Photovoltaic Power Plants On The Roofs Of The Barracks Of The Departmental-Metropolitan Fire And Rescue Service (Sdmis) Of Yzeron And Soucieu
44114-Kaw Sha Photovoltaic Parking Spaces
Solar Photovoltaic Power Station Sfes Turnkey 5 Kw, Panels 560 W. Class A. Degree Of Protection Ii. Ip68. Efficiency 21%> Size; 2278*1134*35M Weight; 29 Kg Inverter Gibrid 6.2 Kw. Mounting Structure Made Of A
Solar Photovoltaic Power Station Sfes Turnkey 5 Kw, Panels 560 W. Class A. Degree Of Protection Ii. Ip68. Efficiency 21%> Size; 2278*1134*35M Weight; 29 Kg Inverter Gibrid 6.2 Kw. Mounting Structure Made Of A
Solar Photovoltaic Power Station Sfes Turnkey 5 Kw, Panels 560 W. Class A. Degree Of Protection Ii. Ip68. Efficiency 21%> Size; 2278*1134*35M Weight; 29 Kg Inverter Gibrid 6.2 Kw. Mounting Structure Made Of A
Solar Photovoltaic Power Station Sfes Turnkey 5 Kw, Panels 560 W. Class A. Degree Of Protection Ii. Ip68. Efficiency 21%> Size; 2278*1134*35M Weight; 29 Kg Inverter Gibrid 6.2 Kw. Mounting Structure Made Of A
Solar Photovoltaic Power Station Sfes Turnkey 5 Kw, Panels 560 W. Class A. Degree Of Protection Ii. Ip68. Efficiency 21%> Size; 2278*1134*35M Weight; 29 Kg Inverter Gibrid 6.2 Kw. Mounting Structure Made Of A
Solar Photovoltaic Power Station Sfes Turnkey 5 Kw, Panels 560 W. Class A. Degree Of Protection Ii. Ip68. Efficiency 21%> Size; 2278*1134*35M Weight; 29 Kg Inverter Gibrid 6.2 Kw. Mounting Structure Made Of A