Similar tenders from other countries.
Showing 1 to 20
Appointment Of Service Provider For The Provision Of A Stand And A Conveyor Belt Sample Cutter Required For Preparing Conveyor Belt Samples For Testing.
Package No. 01: Project Construction Consultancy; Make A Report On Exploration Results; Making Eia Reports And Hydraulic Models; Economic And Technical Report On Construction Of Lo Thien Mines
Package No. 01: Project Construction Consultancy; Make A Report On Exploration Results; Making Eia Reports And Hydraulic Models; Economic And Technical Report On Construction Of Lo Thien Mines
Excavator Rental Service
Shovels
Mao Covered With Charcoal And Solving The Problem Of 1 Lick Night Coal Conveyor System (1200190030)
Forestry Services In The Mining Process For Np Administration Slovak Paradise
Supply Of Waste Climber Rubber Conveyor Belt For Waste To Energy Research Facility (Wterf)
Visual Test Of The Tatrapoma 14 Dm-3 Plate Lift Ropes, Doppelmayr 14Dk-1 Rope Ropes And The Wiegan Winch Lines Wiegand In The Sports And Recreation Center "Góra Kamieńsk" For Pge Giek S.A. Brown Coal Mine Branch Of Bełchatów
Light Dynamic Probe Test For Determining The Compaction Of The Embankments For Pge Giek S.A. Brown Coal Mine Branch Of Bełchatów
Regeneration Of Hydraulic Cylinders Ł-35 Charger For Pge Giek S.A. Brown Coal Mine Branch Of Bełchatów
Purchase Of Cutting Tiles And Drills For Pge Giek S.A. Bełchatów Power Plant Branch
Inquiry For Information (Rfi) - Conclusion Of Framework Contracts For The Delivery Of Sets Of Cruisers In A Period Of 12 Months For Pge Giek Sa Branch Of Brown Coal Mine Turów
Sales And Delivery Of Smooth Steel Cruisers To Conveyors Of The Carburizing System At The Ax
Purchase Of Goods-Loader (Skip)
Works Of The Rehabilitation Of Tower No. 4 And The Conveyor Of Conveyors C6/C7 Of The Mohammedia Operation Department.
Support For Workshops On The Mine Surface For Polska Grupa Górnicza S.A. Kwk Row Branch
Supply And Delivery Of Original Caterpillar Spare Parts With Maintenance Services For Gear Of The Department Of Indre
Aov Sua -Sf 002 2025 Warm Nolo Of G3 And G6.3 Excavators For The Rio Desserted Shipyard - Municipality Of Sarentino
Rad Loader | Waste Management Center Gelnhausen-Hailer