Similar tenders from other countries.
Showing 1 to 20
Provision of desire to rehabilitate the passageway under properties 482 and 483 Al-Suwaiqa.
Design (In The Field Of Srk Industry) And Comprehensive Execution Of Construction Works On The Railway Line No. 622 On The Section H Szczyrzyc - Tymbark As Part Of The Project Entitled: "Construction Of The New Podłęże - Szczyrzyc - Tymbark/Mszana Dolna Railway Line And Modernization Of The Existing Railway Line No. 104 Chabówka - Nowy Sącz - Stage Ii"
Mp-090229 N04/06 Sh Süd-Herblingen Safety Tunnels Tunnel Fässtaub, Construction Management
Mp-160010, N01/42, 46 Verzw. Zh-North – Verzw. Zh-Ast – Verzw. Brüttisell, And Bau Bp2
Routewide Track Drainage
Endla Tn Railway Tunnels Construction
Endla Tn Railway Tunnels Construction
Abs Hu -Gn_Pfa 5.16_Km 39.0 - 42.4_Hauptmandmahmung_Bautechnik
Mp-090229 N04/06 Sh Süd-Herblingen Safety Tunnels Tunnel Fässtaub, Construction Management
Abs Hu -Gn_Pfa 5.16_Km 39.0 - 42.4_Hauptmandmahmung_Bautechnik
2. S-Bahn Master Route Munich, Construction Phase Underground East And Ostbahnhof, Tender And Planning (Optional) Of The Main Construction Services Ve766
1) A Set Of Electricity (High Voltage) Used In The Asahikawa Development Construction Department'S Internal Government Building, Etc.; 2) A Set Of Electricity (High Voltage) Used In Tunnels, Etc. Within The Asahikawa Development Construction Department'S Pipe (Items Subject To Electronic Bidding) (Items Subject To Electronic Contracts)
State Procurement Of The Dn 700Mm Dn 700Mm Dn 700Mm Main Gas Pipeline And The Reconstruction Of The Gas Pipeline (Hereinafter Referred To As The Work) In Accordance With Annex 1 (Project Documentation).
Project Stuttgart-Ulm, S21, Pfa 1.6A, Los B- Tunnel Ober- Untertürkheim; Tec 5/10/239044
Work Of The Constructive Project Of The South Railway Variant Of Bilbao. Phase 1. Section: Serantes Connection
Work Of The Constructive Project Of The South Railway Variant Of Bilbao. Phase 1. Section: Serantes Connection
14Tei10205 2. S-Bahn Master Route Munich-Pu 30 Shell Construction Work Tunnel West With Trough And Hp Hauptbahnhofbahnhofplatz
N01.12 Mp-080159-Upn.Bernex-Ferney-Pose Phono-Absorbants Plates For Portails Confignation, Goats And Vernier (Id 8973)
2. S-Bahn Master Route Munich, Execution Planning For The Construction Work Hp Hauptbahnhof And Hp Marienhof Ve550
Optimization Composting Plant Reinberg - Look 2 "Establishment Of A Bio -Waste Composting System"