40 Live Notices for Central Europe Mining Equipment Tenders
Showing 1 to 20
Calibration Of Measuring Equipment
Delivery Of A Preparation For Wetting Coal Dust In Accordance With Swz
Lease For Jsw S.A. Kwk "Knurów-Szczygłowice" Ruch Szczygłowice Of A Post-Renovation Roadheader With The Possibility Of Making An Excavation In Rocks With A Minimum Compressive Strength Of Rc 100Mpa With A Drilling And Anchoring Trailer
Written Consultation No. 17
Purchase Of Brand New Electrical Equipment For Underground Machinery
Supply Of Air Duct Fans For The Needs Of Pgg S.A. Branches, Divided Into Tasks
Delivery Of Individual Hydraulic Props For The Branches Of Polska Grupa Górnicza S.A. – Group Number 295-1.
Regional Office For Tyrol: Dental Clinic Innsbruck, Local Construction Supervision Including Specialist Öba And Construction Site Coordination
Lease For Jsw S.A. Kwk "Knurów-Szczygłowice" Ruch Szczygłowice Of A Post-Renovation Roadheader With The Possibility Of Making An Excavation In Rocks With A Minimum Compressive Strength Of Rc 100Mpa With A Drilling And Anchoring Trailer
Delivery Of Directional Drilling Equipment To Jsw S.A. Kwk “Borynia-Zofiówka-Bzie” Ruch “Zofiówka”, Including A Wwh-5 Drilling Rig Or Equivalent Together With A Power Unit And The Necessary Accessories.
Renovation Of 18 Sedimentation And Filtration Centrifuges At The Mechanical Coal Processing Plants Of Jsw S.A. Kwk "Borynia-Zofiówka-Bzie", Kwk "Budryk" And Kwk "Knurów-Szczygłowice"
Mining Equipment For Jsw S.A. Plants, Including: Supply Of Suspended Monorails With Their Own Drive, Including Transport Sets And Brake Trolleys, Supply Of Suspended Monorails
Mining Equipment For Jsw S.A. Plants, Including: Delivery Of Flameproof Contactor Switches For Powering Belt Conveyors, Pumps And Fans
Mining Equipment For Jsw S.A. Plants, Including: Delivery Of Flameproof Contactor Switches For Powering Belt Conveyors, Pumps And Fans
Mining Equipment For Jsw S.A. Plants, Including: Delivery Of Electrical Equipment For Powering The Longwall Complex, Along With The Development Of Documentation For The Integrated Control System
Mining Equipment For Jsw S.A. Plants, Including: Replacement Of Wow Dewaterers
Mining Equipment For Jsw S.A. Plants, Including: Delivery And Installation Of A Disa Enrichment Unit, Delivery And Installation Of An Om20 Fines Jig
Mining Equipment For Jsw S.A. Plants, Including: Supply Of Suspended Monorails With Their Own Drive, Including Transport Sets And Brake Trolleys, Supply Of Suspended Monorails
Coal Or Rock Cutting Machines For Jsw S.A. Plants, Including: Purchase And Delivery Of Roadheaders And Longwall Shearers; Rental Of Roadheaders And Longwall Shearers
Various Engineering Services In Jsw S.A. Plants, Including: Modernization Of The 6Kv Rmwiiis Connection And The Mwiiis Hoisting Machine Control System Together With The Reactive Power Compensation System, Installation Of Shaft Equipment, Comprehensive Service Of The Foch Ii Shaft, Comprehensive Service Of The Mining Shaft Hoist Installed In The Southern Section Of Shaft Ii