36 Live Notices for Switzerland Engineering Design Tenders
Showing 1 to 20
Uw Beznau – Delivery And Installation Of Hv Cables
M2-M3 - Metro Development Project - Modifications To The Overhead Road Contact Line During The M3 Works
Electrical Engineering Services For The New Construction Of Schulhaus Mitte In 3902 Glis
Mp-080424, N11/60, N01/42 Uplans Verzw. Zh-Ost – Kloten Süd (Zok), Fm Umwelt
Utility Line Renovation And Street Space Design, Obere Mühlemattstrasse, 4800 Zofingen
Revision Of The Cantonal Master Plan: Development Of The Citizen Participation Strategy
Mp-080424, N11/60, N01/42 Uplans Verzw. Zh-Ost – Kloten Süd (Zok), Fm Umwelt
10202 K 4 Kriens, Center (Excl.) To The Junction With Südstrasse (Excl.)
24_467 Construction Management Services
24_467 Construction Management Services
Mp-080424, N11/60, N01/42 Uplans Verzw. Zh-Ost – Kloten Süd (Zok), Condition Investigations Of Bridge Bearings For Phase Mk
11429 K 4, Lucerne/Malters, Horüti - Under Rängg, Bridge Extension, Optimization Of The Route, Construction Of A Cycle Path
Mp-080424, N11/60, N01/42 Uplans Verzw. Zh-Ost – Kloten Süd (Zok), Condition Investigations Of Bridge Bearings For Phase Mk
11429 K 4, Lucerne/Malters, Horüti - Under Rängg, Bridge Extension, Optimization Of The Route, Construction Of A Cycle Path
Bret Drinking Water Plant - Maintenance Works 2025-2028 - Refurbishment Works Of Carbon Filters - Design, Supply, Production And Commissioning Of Carbon Filters - Works Of Company No. 2
Bret Drinking Water Plant - Maintenance Works 2025-2028 - Refurbishment Works Of The Current Sand Filters - Design, Supply, Production And Commissioning Of Expanded Clay Filters - Works Of Company No. 1
K11 Alberswil, Section Dorf - Unterdorf; Renovation Of Civil Engineering Structures And Extension Of Standard Profile
K11 Alberswil, Section Dorf - Unterdorf; Renovation Of Civil Engineering Structures And Extension Of Standard Profile
Hlks- Ga- Engineering Services For The New Construction Of The Central School Building In 3902 Glis
Jenaz, Station Reconstruction / Project Author (Sia Phases 41 – 53)