Similar tenders from other countries.
Showing 1 to 20
Concrete Repair Works – Emerald Bridge B4850 – 28.70Km
Concrete Repair Works – Farmers Hall Bridge B1350 – 26.46Km
Road Restraint Systems – Great Kei River Bridge – B149 – 80.22Km
Precast Panels And Precast Handrails To Bridges B1252 (12.29Km) B4084 (17.70Km) B149 (80.22Km)
Concrete Repair Works – Great Kei River Bridge B149 – 17.70Km
Strengthening Traffic Safety At Intersections Km733+400, Km737+800 (Old Route), Km741+00 And Section Km719+550 - Km720+450 Of National Highway 1, Section Km741+100 - Km741+400 Of Hien Luong Bypass; Repairing Damaged Gia Dang Bridge Km729+090, Tria Bridge Km732+067 Of National Highway 1 And Chau Thi Bridge Km730+425 (Hien Luong Bypass); Adding Local Anti-Glare Nets On The Section From Km772+916 - Km791A+500; Restoring Painted Lines On Section Km769+800 - Km791A+500 Of National Highway 1; Supplement And Repair Road Signs At Km719+500 - Km730+00, Km769+800 - Km791A+500 Ql.1 And Km729+820 - Km741+600 (Hien Luong Bridge Bypass); Repair Corrugated Iron Guardrails, Marker Posts, Km Posts, Replace Dpc Reflective Eyes Between Km717+100 - Km741+170, Km769+800 - Km791A+500 Ql.1 And Km729+820 - Km741+600 (Hien Luong Bridge Bypass); Strengthen The Traffic Safety System Through Schools On The Km728+300 - Km791A+300 Section, National Highway 1, Quang Tri Province
On Approving The Contractor Selection Plan For The Investment Preparation Phase Of The Project To Improve Green Areas And Install Exercise Equipment In The Area Around Ba Chiem Bridge To Serve People'S Lives.
Selecting A Consulting Contractor To Develop A Plan To Move Power Lines To Clear The Project Site: Investing In The Construction Of Tan An Bridge And Access Road Connecting National Highway 18 To Chi Linh City, Hai Duong Province
Plan For Selecting Contractors For The Bidding Packages In The Preparation Stage Of Preparing Construction Drawings For The Project: Construction Of Tan Dan Bridge, Quynh Hung Commune, Quynh Phu District
Workers' Bridge, Hop Thanh Village, Binh Luong Commune, Nhu Xuan District, Thanh Hoa Province
New Road Bridge Near Björneborg Km 277+739
Project Documentation For The Reconstruction Of Bul. 1St May From Sali Bridge To Vera Ciriviri Street L=355M
B0204 Stadium Bridge - Reinforcement
Planning Services - Halle Junction, Route 6343, Renewal Of The Roadway Structures Saale Bridge And Saale Flood Bridge, Overall Trade Planning
Maintenance And Repair Services And Works Of Roads, Bridges And Their Annexes - County Roads
Replacement Construction Of The Weir Bridges Over The Power Plant Canal And Weir Fields 1 To 4
Replacement Construction Of Spatzenbrücke (Bridge Structure Bw 6516 403) - Engineering Services / General Planning Services
Greensboro, Shadow Lake Road Bridge Replacement
Bidding For The Construction Of The Reinforced Concrete Bridge Project, Khlong Nakok, Village No. 2, Khlong Hin Subdistrict, Ao Luek District, Krabi Province, By Electronic Bidding Method.
Bidding For The Construction Of Asphalt Concrete Road Surface Repair (By Pavement In Place Recycling Method) For The Maintenance Of Ks.017 Lam Phang Bridge, Saphan Thong Friendship Bridge, Kut Sim Khum Mai (Community Bridge), Khao Wong District, Kalasin Province, 1 Location, By Electronic Bidding Method.