Similar tenders from other countries.
Showing 1 to 20
Supply And Delivery Of Fuel Forwarding Pumps And Accessories
Related To The Project Of Disassembling, Moving, Overhauling, Installing And Commissioning The Second Row Of Gas-Powered Turbines Instead Of Turbine Number 7 Of The Oil Pump House Number 1 Of Omidiyeh, Related To The Letter Of M.A.J./0137/1402
Construction Of Residential Flat For Govt Employee At 36 Nos Abandoned House In Chattogram (Sub-Head: Supply And Installation Of Lift For Building No. 30/B2, Road No: 3, Nasirabad Housing Society, Chattogram)
Construction Of Residential Flat For Govt Employee At 36 Nos Abandoned House In Chattogram (Sub-Head: Supply And Installation Of Lift For Building No. 98 & 99, Ambagan Road, Chattogram)
Supply of spare parts for the hydraulic system of the seawater circulation pump valve for the combined cycle gas turbines, first phase, at Al-Zour South Station
Procurement Of Fire Extinguisher And Refill For Fire Extinguisher Cylinders
23 Day(S) 21 Hour(S) 50 Minute(S) 57 Second(S)
ساخت P/F TOSI STEAM TURBINES, PINION & GEAR WHEEL WITH SHAFT
Supply Rolls-Royce Turbine Test Facility Control Optimization
Procurement Of One Unit Of Fuel Reserve Tank And One Unit High Speed Digital Diesel Dispensing Unit With Necessary Related Services.
Gas Turbines Robotic And Boroscopic Generator Inspection At Moni Power Station
Purchase Order of Spare parts for hydraulic system for control system on fuel valves and natural gas for gas turbines with combined cycle – first phase - at Al Zour Southern Plant
Purchase Order of Spare parts for cooling towers for a/c water refrigeration units for gas turbines with combined cycle – first phase - at Al Zour Southern Plant
Spare parts for burning room lines and burners cleaning pump for gas turbines with combined cycle – first phase - at Al Zour
Spare parts for chemical injection system for gas turbines with combined cycle – first phase - at Al Zour Southern Plant
2840 - GAS TURBINES AND JET ENGINES, AIRCRAFT, PRIME MOVING; AND COMPONENTS
Dynamic Purchasing System For Purchasing Mechanical Spare Parts Incl. Associated Service, Repair And Components For The Sävenäs Waste Heat Treatment Plant In Gothenburg
Spare parts for the cleaning pump of the combustion chamber lines and burners for the first phase of the combined cycle gas turbines at the Al-Zour South Station
Spare parts for the chemical injection system for the combined cycle gas turbines, phase 1, at Al-Zour South Station
Call For Re-Tendering At The Same Time As One-Stage Quality Assessment (Integrated) Of Oil Analysis Of Turbines, Compressors, Generators And Transfer Motors Of Gas Pressure Boosting Facilities And Heavy Construction Machinery In Region Two, Advertisement Number: 87330056