Similar tenders from other countries.
Showing 1 to 20
Open Race Pursuant To Art. 71 Of The Procurement Code With Application Of The Criterion Of The Most Economically Advantageous Offer For The Selection Of Private Partners For The Integration Of The Publicized Public Partnership Institutionalized Pursuant To Art. 17 Of Legislative Decree 19 August 2016 N. 175, Called Cosyet Scarl --– Cup Code J63C22000430001- Pnrr Code: M4-C2-I3.1- Identification Code
Purchase order of internal operational spare parts for control valves on the entry of natural gas for gas turbines of combined cycle – first phase – at Al Zour Southern Plant
Purchase Request for Internal Operational Spare Parts for Gas Pressure Regulating Valves and Quick Shut-Off for Natural Gas Receiving Station for Combined Cycle Gas Turbines Phase 1 at Al-Zour South Station
Industrial Pumps For The Cooling Circuit Of The Power Station With Cycle Combined With Iernut Gases
Update The Control System For A Number Of (8) Gas Turbines Ww 25 B8 In King Khalid Military City
Provision of Manufacturing PARTS FOR "CNR" STEAM TURBINE ROTOR WITH BLADES TTP-601 Second Round
SUPPLY & INSTALLATION OF CNG GENERATOR AT CAC LAGOS OFFICE
SUPPLY & INSTALLATION OF GENERATOR AT CAC BAUCHI OFFICE
SUPPLY & INSTALLATION OF CNG GENERATOR AT CAC KADUNA OFFICE
SUPPLY & INSTALLATION OF CNG GENERATOR AT CAC ENUGU OFFICE
SUPPLY & INSTALLATION OF CNG GENERATORS AT CAC KANO OFFICE
SUPPLY & INSTALLATION OF CNG GENERATOR AT CAC PORT HARCOURT OFFICE
SUPPLY & INSTALLATION OF CNG GENERATOR AT MAITAMA HEAD OFFICE
Supply Of Air Intake Filters For Gas Turbines At ‘H’ Station, Phase-Iv, Al Aweer
Study, Supply And Installation Of Flame Stops, Emptying, Decennal Control And Baremage Of Combustible Tanks From The Mohammedia Gas Turbines 3X100Mw Power Station
supply for SGT-800 Filter long term
Procurement of consumable materials for the lathe of gas turbines of combined cycle – first phase – at Al Zour Southern Plant
Lm2500 Dfc & Gtc Materials
repair of two GEC power turbines and two Elliott compressors of the 700 and 800 liquefied natural gas plants
Purchase Request for Internal Operational Spare Parts for Natural Gas Intake Control Valves for Combined Cycle Gas Turbines Phase 1 at Al-Zour South Power Plant