285 Live Notices for Eastern Europe Water Treatment Tenders
Showing 1 to 20
Reconstruction And Modernization Of The Nová Bystrica Water Treatment Plant.
Construction Supervision On Selected Construction Projects Of Sewers, Wastewater Treatment Plants And Water Mains
Successive Delivery Of Preparations And Consumables For The Nanofiltration Installation For Preliminary Water Treatment For Pge Energia Ciepła S.A. Wybrzeże Branch In Gdańsk
Disassembly And Assembly Works Related To The Installation Of A New Caustic Soda Tank In The Water Treatment Plant In The Boiler Room
"Providing Services In The Field Of 24-Hour, Direct Physical Protection Of People, Facilities And Property"
Successive Delivery Of Preparations And Consumables For The Nanofiltration Installation For Preliminary Water Treatment For Pge Energia Ciepła S.A. Wybrzeże Branch In Gdańsk
Purchase And Successive Delivery Of Chemical Reagents, Disposable Kits For The Posijet Lemar Pax Device, Isolation Kits With Thermal Cycler Rental, Bacteriological Materials.
Design And Execution Of Works For The Objective "Establishment Of A Water Supply System In The Community Of Livezi, Valcea County"
Sv-Cl-06 - Modernization And Expansion Of Water Sources, Water Management Facilities And Water Storage Capacities In The Localities Of Radauti, Marginea, Vicovu De Sus, Putna And Siret
Brno, Veveří - Reconstruction Of The Sewerage And Water Supply System
Natural Park By The Water Reservoir In Rosice - Gardening
Havlíčková Borová Water Supply System Strengthening Water Resources And Intensifying Water Treatment 2025
Purchase Of Reagent Sets For Determining Free Chlorine
Reconstruction And Modernization Of The Nová Bystrica Water Treatment Plant.
Delivery Of Reagents, Reference Blood Cells, Consumables And Small Equipment For The Serological Equipment Owned By The Ordering Party And The Lease Of A Water Treatment Plant For The Field Station In Wrocław.
"Engineering (Design, Author'S Supervision, Construction And Supply Of Equipment) For An Internal Water Supply And Sewage Network And A Wastewater Treatment Plant In A Separate Territory, Served By "Water Supply And Sewage" Eood - Haskovo With 2 Separate Positions"
Modernization Of Make-Up Water Pipelines In The Area Of The Water Treatment Plant On The Premises Of Pge Energia Ciepła S.A. Branch Of The Kielce Chp Plant
Modernization Of Make-Up Water Pipelines In The Area Of The Water Treatment Plant On The Premises Of Pge Energia Ciepła S.A. Branch Of The Kielce Chp Plant
Water Treatment Products - Lot 3 Pax Aluminum Polyhydroxychloride - Acord-Cadru
Water Treatment Products -Lot 2 Ferric Chloride - Min 40% Solution - Framework Agreement