401 Live Notices for Egypt Civil Engineering Tenders
Showing 1 to 20
Construction and operation of a 1/2 Olympic swimming pool with its accessories With a usufruct system for 12 years
Modifying the route of Complex No. 4, right of the bank, published the bottom in the Sandala First Area “A” On account of the General Authority for Roads and Bridges, Zone 13, Beheira
Replacement and renewal of the lining of the eastern Rash Canal from km 10.500 to km 12.500, with a length of 2 km in the Irrigation Inspection Department of Qibli Al-Nasr
Construction of a wall And an administrative building in 6th of October
Improving the sewage service for the streets of Medina Al-Zahraa - Abu Bakr - Muhammad Abd al-Na'im - Abd al-Rahman al-Dariri - Ahmad Ibrahim - Ali Abbas Ba'ziyya al-Jaluli | Kafr Taherms and other scattered areas in Giza
Implementation of 5,000 home sewage connections in Saff City and other scattered areas in Giza.
Improving pressures and replacing and renewing drinking water lines in the Ezbet El-Galouli area and various streets in Kafr Taherms - Haram networks in the Central Giza sector for drinking water and any other areas in the Central Giza sector
Extending and reinforcing drinking water lines in the villages of Takla and Umm Dinar in the Manshiyat Qanater Center - North Giza Sector, as part of the presidential initiative (Decent Life - Second Phase)
Extending and reinforcing drinking water lines in the villages of (Al-Ikhsas - Wardan) in the Manshiyat Al-Qanater Center - North Giza Sector, as part of the presidential initiative (Decent Life - Second Phase)
Extending and reinforcing drinking water lines in the villages of (Abu Al-Abbas - Tahma - Kafr Barakat in Al-Ayat Center - South Giza Sector) within the presidential initiative (Decent Life - Phase (Second)
Extending and reinforcing drinking water lines in the village of Manshiyat Abd al-Sayyid, Al-Ayyat Center, South Giza Sector, as part of the presidential initiative (Decent Life - Second Phase)
Extending and reinforcing drinking water lines in Dahshur village - Badrashin Center, South Giza Sector, as part of the presidential initiative (Decent Life - Second Phase)
Implementation of 5,000 home sewage connections in the villages of | Tahma - Manshiyat Abdel Sayed (Al Ayat Center) and any other scattered areas in Al Ayat Center
Implementation of 1,500 home sewage connections in the villages of Kafr Barakat and Abu Al-Abbas (Al-Ayat Center) and any other scattered areas in Al-Ayat Center within the presidential initiative (Decent Life - Phase (Second)
Implementation of the power station project in Sheikh Zayed Building
Improving the efficiency of the Faculty of Specific Education, infrastructure works, the theater, the administrative building (formerly the Children's Library), and installing cameras.
Replace, renew, support and upgrade the efficiency of networks and expulsion lines on various streets in the Montazah 1 and Montazah 2 areas for the fiscal year 2025/2026
Replace, renew, support and upgrade networks and power lines on various streets in the East and Central regions
Replace, renew, support and upgrade networks and lines in various streets in the customs areas
Restoration and rehabilitation of the conference center building