3 Live Notices for Egypt Concrete Tenders
Showing 1 to 3
supplying and installing polyethylene mesh, covering the gabions for places where there are no gabions, and protecting them with a layer of phenolic concrete for the South Qantara East Canal, from km 6,400 to km 12,500 In the brine of the Southern Engineering Al Qantara East
Reinforcing the concrete foundations of (32) towers affiliated with the Overhead Lines Administration in the Southern Region, with a voltage of 5008220 kV Line up creams effortlessly 52.26.17(500kV Towers No. 104.92.69.62.59.57.53. 116.109.108.107.106.105 (137.134.132.126.123.119 Al-Tabbin Wadi Hawf power generation line, 220 kV, in tower (95) No. (94) and South Cairo Wadi Hof line, 220 kV, in towers South Tebbin Tebbin 500 line, 220 kV, in towers Heliopolis-Nahda line, 220 kV, in towers No. (48.46)
Construction of the first phase “concrete and buildings” for 5 residential buildings In plot No. 15 in the October Pearl Association project, with an area of 2.1 acres