Similar tenders from other countries.
Showing 1 to 20
2025-180000-0416-Wolf Creek Elementary School
“Renewal Of The Building Of The House Of Culture And The Holumnica Municipal Office”
Reconstruction Of Elementary School - Tekovské Nemce
Construction Work Within The Project “Municipal House - Multipurpose Building, Duplín - Renewal”.
Ružomberok, Small Area Úvn - Reconstruction - R
Bratislava, Dk - Reconstruction Of The Building No. 9 - R
Increasing The Energy Efficiency Of The Lipovec Kindergarten Building
“The Reduction Of The Energy Intensity Of The Public Building Of The Umb Faculty Of Political Sciences And International Relations, Kuzmányho Č.1 Banská Bystrica”
Social - Rehabilitation Center In Zlaté Moravce
New Building Of The Apartment Building Olešná - 23 B.
Extension And Extension To The Elected Workplace To The Fully Organized School Of Elementary School And Kindergarten, Slovak Grob
Construction Work: Collection Yard In The Village Winner
New Turbine Tg-1 In The Martin Plant
40 Vpp Energy Rehabilitation Works Group Se-7078
Reform Works, Simple Repair, Conservation And Maintenance, With Guild Coordination, In The Buildings Of Lehendakaritza And Palacio De Ajuria-Enea, In Vitoria-Gasteiz.
40 Vpp Energy Rehabilitation Works Group Se-7078
Energy Reform Works Of The Alange'S Pensioner'S Home Building. Prtr / Pree 5000 Program
The Existing Building Does Not Have Continuous Thermal Insulation Throughout Its Envelope And Has A Large Number Of Thermal Bridges That Cause Energy Losses. For This Reason, Measures Of Roof Isolation And Facades Are Proposed And The Replacement Of Exterior Carpentry To Ensure That It Complies With The Parameters Described In The Cte According To The Climate Zone In Which The Equipment Is Located (Zone D1). It Is Proposed To Carry Out The Installation Of Cooling And Ventilation Of The Pavilion Through A Roof-Top Type System, It Is A Compact Unit That Performs The Dual Function. It Is Connected To A Properly Isolated Network Of Behaviors To Distribute The Air Inside. It Is A Very Efficient System Because Its Eer/Blow Is 4.05/4.28. In Intermediate Climatic Times, It Can Work As A "Free-Cooling", So That The Space Could Be Air Conditioning With The Direct Air From The Outside After Leaked Only By Ventilation. Also, As An Improvement In Action, It Is Proposed To Install A New Marquee Attached To The Southeastern And Southwestern Facades Of The Building To Generate An Exterior Area Covered In Contact With The Changing Room Exit To The Pool And With The Exit Of The Pavilion To The Rear Area Where The New Gardening Will Be Made. On The Southwest Facade Of The Pavilion Is An Outdoor Space That Has A Direct Connection With Both The Pavilion And The Pool. This Is A Space That Is To Be Valued And For This Reason It Is Proposed To Adapt Its Urbanization, Which Currently Consists Of A Hard Cement Pavement, In Order To Introduce Landscaping Elements And Soft Pavements That Will Be In Contact With The New Proposed Marquee, Generating A Recreational Or Rest Area Through The Sports Facilities. It Is Proposed To Plant Trees And Vegetation In The Area To Reduce Maintenance Costs. The Proposal Contemplates The Excavation Of The Surface Land, The Improving Of The Land Based On The Compaction Of A Head
Aghdam District Guzanli Settlement Terms Of Houses In The Area Called Stone Houses
Overhaul Of The Pressurized Metal Pipeline (D = 720Mm, L = 400 M) At The Malimin Pumping Station