183 Live Notices for Infrastructure and Construction bids and RFP from Egypt
Showing 1 to 20
Design And Build Of Kafr Al Jaraydah Wastewater Treatment Plant Rehabilitation And Expansion 5,000M3/D
Restoration of the workshop building and its annexes and carrying out the necessary maintenance of the sewage system of the administration building
Developing, paving and upgrading the streets of Heliopolis
Paving the street of the National Interests Complex And its branches within the scope of the Second District of Zagazig
Construction of a fence and gate to develop the mechanical campaign building
Paving process (interlock tiles) in the mosque section area,
Supply and installation of interlocking tiles for paving the club’s internal roads and streets
1] Paving of the Kom Hamada Bank Bridge road, 2 km long, in the center of Kom Hamada 2] Completing the paving of the Edco Center corporate road 3] Paving of Ali Maher (Abu Qir Fertilizers) road, 4 km long, Kafr El Dawar center 4] Paving the Kajo-Farhash road, 4.5 km long, Housh Issa center 5] Construction of a pedestrian bridge over the Khandaq Canal in front of the College of Sharia
1] Completing the paving of the 3 km long Nakhnoukh Al-Maghazi Road in the center of Mahmoudiyah 2] Completing the paving of the Al-Khairy Bank - Bastra Bridge, 7 km long, in Damanhour Center 3] Completing the paving of Road 105 Malona in Qatar (Al-Halwaja), with a length of 1.5 km, Abu Al-Matamir Center 4] Completing the paving of the Corniche Road, the surface works of the previous plan, with a length of 700 meters - Damanhour Center
Paving some roads in Atfih city and center
Renting the second, third and fourth floors above (concrete structure, roof and columns only) and the roof to build a hotel
Completing the development and raising the efficiency of the Religious Institute Street and Al-Ahrar Al-Aslouji Road.
Completion of the Gemmayzeh Beni Amr-Taraat El-Dabijiya road -
Construction of a retaining wall on the Buha Drain (Taha Al-Marj)
Completion of the Deirb Al-Souq - Safour road
Completing the prevailing wall on Ramses Bank
Completing the Manchester Li road to Awamra
Paving the Malams-Al-Walja road
Completing the paving of the Tahla Burdin - Beni Hilal road
Completing the paving of the Hahia - Al-Qanater Al-Safra - Kafr road