Developing and raising the club's efficiency
Implementing civil protection work to reduce fires in accordance with fire codes and civil defense directives For buildings next to Gate 35 inside the customs office
Implementation of beautification works on the Edfu-Esna highway in the city of Al-Basiliya
Completing the investment in Banha Center, raising the efficiency and installing interlocking tiles on Al-Jazzar and Shaarawy Streets, branching off from Al-Mawqif Street, in front of Anas Bin Malik School.
Demolition, removal and sale of the waste from the top floor of the administrative building at the College of Agriculture
Provision of street cutting and passage works (tunneling under railways, roads, and waterways) within the company's four sectors
Provision of medium and low voltage overhead network implementation and maintenance works within the company's four sectors
Provision of medium and low voltage cable works within the company's four sectors
Provision of Four ILS/DME Systems at Taba, Abu Simbel, Asyut and Hurghada (Turnkey Project)
Establishing a bank building in Minya Governorate
Provision of operation / replacement and renewal of Arab Al-Madabigh WWTP (2) with triple treatment system
Provision of replacement and renewal of the Assiut slope network
Provision of extension and reinforcement of water networks in Assiut Qibli Center and its villages
Provision of completion of the implementation of house connections for sanitation projects in Assiut Bahri Center area (villages: Al-Hadaia, Al-Bura, Alwan, Masraa, Awlad Rayek, Salam)
Provision of Replacement and Renovation of Female Students' Restrooms, Building (B) at the Faculty of Commerce
Paving, maintaining and upgrading some streets in the East District
Establishing and equipping the event hall and children's theater
Rentibg of 11 commercial shops With a usufruct system for 7 years
Provision of paving two streets with interlocking paving in Gamasa City
Paving some streets in the Kafr El Bad Mas and Qolengil areas