2 Live Notices for Non-Renewable Energy bids and RFP from Egypt
Showing 1 to 2
Implementation of the work of lifting the tanker Egypt 1 to dry land and performing Umrah Its location is in the port of Zeniat in the Suez Petroleum Basin warehouse.
Provision of Guarding a portion of the petroleum products lines, Mostorod-Suez, with a length of 50 km including 21 bluff rooms, guarding a section of the Badr Al-Tabbin tube line, diameter 20, length 5 km, and guarding medium voltage electricity poles