18 Live Notices for Spain Bridges Construction Tenders
Showing 1 to 18
Pedestrian Walkway In Marcilla
Framework Agreement For The Contracting Of Works For The Restoration And Replacement Of Damage To Facilities And Cleaning And Repair Of Infrastructures For Damage Caused By La Dana Between October 28 And November 4, 2024, Including Works Financed With Funds From The Recovery, Transformation And Resilience Plan Financed By The European Union
Tender Notice From: Adif - Presidency. Purpose: Works For The Execution Of The Treatment Project For The Metal Bridge: Trubia P.K. 011/980, L 760 · Oviedo - Trubia T.M. Oviedo (Asturias). File: 3.24/27506.0050.
The Carrying Out Of Works To Improve And Prevent Flooding In The Salencar De Barruera
Improve Energy Efficiency, The Building Envelope And The Incorporation Of Insulation. In The Vertical Elements Of The Envelope, The Construction Solution Adopted Is Always The Same, To Create An External Thermal Insulation System (Sate) In The Opaque Enclosures Of The Main Building. Its Thickness Is 8, 10 Or 12 Cm Depending On The Case. In The Gaps Of The Openings, The Thickness Of The Insulation Is Reduced In Order To Be Able To Stay Within The Thickness Of The Frames Of The Carpentry And Thus Eliminate The Thermal Bridge In Jambs, Lintel And Sill. Regarding The Finish Of These Walls, In Most Facades A Ceramic Baseboard Is Planned To Improve Their Durability, And The Rest Of The Surface Is Solved With A Thin-Layer Organic Finish. Secondly, Regarding The Horizontal Elements, We Find Different Systems To Incorporate Insulation In The Existing Elements. In Summary, We Find Three Types Of Constructive Solution: The First When The Roof Has An Air Chamber, The Second When The Roof Is Inclined And In Direct Contact With The Outside And Finally We Have A Part Where There Is A Registerable False Ceiling But Without Insulation. In The First Case, The Insulation Is Achieved By Blowing The Necessary Thickness Of Insulation From The Upper Part Of The Roof In Order To Avoid Interference With The School. In The Second Case, The Solution Involves Adding A False Ceiling That Incorporates The Required Insulation And, In The Last, Insulation Will Be Added Above The Existing False Ceiling. There Is Also A Series Of Interventions Focused On Reducing Overheating Of The School Classrooms, Which Do Not Have Any Cooling System. In This Way, The Comfort Of Users Will Be Improved, Especially In The Hot Months. It Is Proposed To Reduce Incident Radiation Through Two Different Shading Systems.
Works Channel Torrenueva And Calahonda, T.M Motor (Gr)
And_46 Conditioning And Enhancement Of The Eastern Section Of Puente Mocho.
Installation Works Of A Walkway And Suspension Bridge Over The Estena River, Municipality Of Navas De Estena (Ciudad Real), Within The Framework Of The Prtr
And_46 Conditioning And Enhancement Of The Eastern Section Of Puente Mocho.
Restoration And Conservation At The Anceu Bridge In Berducido, A Lama
Tender Notice From: Presidency Of The Ebro Hydrographic Confederation. Purpose: Extension And Improvement Of The Campiel Bridge. Territorial Restoration Plan For The Mularroya Reservoir. Zaragoza-Calatayud. Project 10/19 And Addendum 04/24. File: 107/24-Ob.
Tender Notice From: Adif Alta Velocidad - Board Of Directors. Purpose: Execution Of The Works For The Construction Project Of Reinforcements In Existing Overpasses In The Railway Connection Of The Mediterranean Corridor With The Lav Madrid - Barcelona - French Border, Between Vandellós And Tarragona. File: 3.24/20810.0080.
Contract For Services And Supplies Of Different Prototype Plants For The Laboratories Of The Iberian Centre For Research In Energy Storage (Ciiae) Of Fundecytpctex, Within The Framework Of The Recovery, Transformation And Resilience Plan
Supply Of Scientific Laboratory Equipment For The Iberian Centre For Energy Storage Research (Ciiae) Of Fundecyt-Pctex, Within The Framework Of The Recovery, Transformation And Resilience Plan
Execution Of Works For The Construction Project Of Reinforcements In Existing Overpasses In The Railway Connection Of The Mediterranean Corridor With The Lav Madrid – Barcelona – French Border, Between Vandellós And Tarragona.
Construction Project For Reinforcements In Existing Overpasses In The Railway Connection Of The Mediterranean Corridor With The Lav Madrid – Barcelona – French Border, Between Vandellós And Tarragona.
Expansion And Improvement Of The Campiel Bridge. Territorial Restoration Plan For The Mularroya Reservoir. Zaragoza-Calatayud. Project 10/19 And Addendum 04/24.
Contract For The Drafting Of The Preliminary Project And Construction Project (Ap-Pc) Of The New Access Road From The Provincial Highway Hu-4402 To The Sanlúcar De Guadiana International Bridge (Spain) To Alcoutim (Portugal). Direct Subsidy Ministry Of Transport And Sustainable Mobility