3 Live Notices for Spain Drilling Tenders
Showing 1 to 3
The Contract Will Be The Purpose Of The Execution Of The Works Contained In The `` Evaluated Report Of The Works Of Rehabilitation Of The Well Of The Dump '', Drafted By Municipal Technical Services And Definitively Approved By Agreements Of The Local Government Board Of June 6, 2025. In Accordance With The Reported Report, Its Object Is To Describe The Necessary Actions For The Rehabilitation Of The Well. This Well Is Part Of The Facilities Of The Water Supply Service Of Bigues And Riells Del Fai, But Is Currently Out Of Service. The Nominal Flow Of The Installed Pump Is 45M3/H. The Water Supply Memory Plans To Make A Drilling With Simultaneous Casing, The Poul Coating With Pvc-U Pipe 280-250, As Well As The Well Equipment With The Pumping System And The Installation Of The Necessary Vertical Pipes. These Actions Are Subsidized Within The Framework Of The Acc/3498/2023 Order, Of October 17, Which Approves The Regulatory Bases Of The Subsidy To Local Entities For Investments For The Recovery, Rehabilitation, Adaptation And Execution Of Groundwater Catchments For Drinking Water Supply To The Population.
Supply And Installation Of A Folding Module Online Dc-F100 Model For The Cutter, Cleft And Multifunction Drill Dride Dc-618 Dc648 For Graphic And Digital Service
Supply Of Consumable Products With The Transfer Of Equipment For The Realization Of Analytical Determinations Of The Neonatal Program Of Endocrine-Metabolic Diseases Of The Community Of Madrid In The Sº Of Clinic Biochemistry Of The Gregorio Marañón University General Hospital