89 Live Notices for Spain Energy Efficiency Tenders
Showing 1 to 20
Services Contract For The Technical Assistance Of Coordination Of Health And Health Of The Works Of The Executive Project For The Rehabilitation And Improvement Of The Energy Efficiency Of The Building Of The Móra D'Ebre Regional Hospital. Key: Hmt-22244, Included In The Promotion Promotion For The Rehabilitation Of Public Buildings (Pirep), Within The Framework Of The Recovery, Transformation And Resilience Plan-Funded By Laue.Next Generation Eu.
Services Contract For The Technical Assistance Of Coordination Of Health And Health Of The Works Of The Executive Project For The Rehabilitation And Improvement Of The Energy Efficiency Of The Building Of The Oenological Station, In Reus. Key: Avt-22276, Included In The Promotion Program The Rehabilitation Of Public Buildings (Pirep), Within The Framework Of The Recovery, Transformation And Resilience Plan-Funded By The Eu.Next Generation Eu
Contract For Technical Assistance In Drafting The Executive Project And Subsequent Construction Management Of The Decarbonisation And Energy Efficiency Improvement Works At The Germans Trias I Pujol Hospital In Badalona. Code: Hbb-24333
Work To Improve Energy Efficiency In Sica Madinat Al-Zahra
Drafting Project And D.F. Works Adaptation And Improvement Of Energy Efficiency Cas
Service Contract For Technical Assistance For The Drafting Of The Executive Project And Subsequent Site Management Of The Decarbonization Works And Improvement Of The Energy Efficiency Of The Facilities Of The Germans Trias I Pujol Hospital, In Badalona. Code: Hbb-24333
Service Contract For The Management Of The Execution Of The Rehabilitation And Improvement Of The Energy Efficiency Of The Sant Adrià De Besòs Civic Center - La Mina. Code: Bse-22321, Included In The Public Building Rehabilitation Program (Pirep), Within The Framework Of The Recovery, Transformation And Resilience Plan - Funded By The Eu. Next Generation Eu
2025-21 Mag Services For Planimetric Survey Work, Report With The Study And Analysis Of The State Of The Buildings And Annexes With An Executable Budget, Obtaining The Habitability Certificate, Energy Efficiency Certificate And Solidity Certificate Of The Set Of Buildings Located In The Area Of Santa Maria De Gallecs
Ser_Obe_2024_0022
Execution Of Works To Improve Energy Efficiency At The Pereiro De Aguiar Penitentiary Centre (Orense) Within The Framework Of The Recovery, Transformation And Resilience Plan - Financed By The European Union - Next Generation Eu
Contract For The Works Necessary For The Partial Replacement Of The Roofs Of The Municipal Services Building, Hosting These Areas Of Action The Municipal Library And The Day Center, With The Aim Of Partially Adapting This Public Building In A Passive Way To Avoid And Prevent Excess Heat And Cold, As Well As Improving Its Energy Efficiency.
Improve Energy Efficiency, The Building Envelope And The Incorporation Of Insulation. In The Vertical Elements Of The Envelope, The Construction Solution Adopted Is Always The Same, To Create An External Thermal Insulation System (Sate) In The Opaque Enclosures Of The Main Building. Its Thickness Is 8, 10 Or 12 Cm Depending On The Case. In The Gaps Of The Openings, The Thickness Of The Insulation Is Reduced In Order To Be Able To Stay Within The Thickness Of The Frames Of The Carpentry And Thus Eliminate The Thermal Bridge In Jambs, Lintel And Sill. Regarding The Finish Of These Walls, In Most Facades A Ceramic Baseboard Is Planned To Improve Their Durability, And The Rest Of The Surface Is Solved With A Thin-Layer Organic Finish. Secondly, Regarding The Horizontal Elements, We Find Different Systems To Incorporate Insulation In The Existing Elements. In Summary, We Find Three Types Of Constructive Solution: The First When The Roof Has An Air Chamber, The Second When The Roof Is Inclined And In Direct Contact With The Outside And Finally We Have A Part Where There Is A Registerable False Ceiling But Without Insulation. In The First Case, The Insulation Is Achieved By Blowing The Necessary Thickness Of Insulation From The Upper Part Of The Roof In Order To Avoid Interference With The School. In The Second Case, The Solution Involves Adding A False Ceiling That Incorporates The Required Insulation And, In The Last, Insulation Will Be Added Above The Existing False Ceiling. There Is Also A Series Of Interventions Focused On Reducing Overheating Of The School Classrooms, Which Do Not Have Any Cooling System. In This Way, The Comfort Of Users Will Be Improved, Especially In The Hot Months. It Is Proposed To Reduce Incident Radiation Through Two Different Shading Systems.
Service Contract For Technical Assistance For The Management Of The Execution Of The Rehabilitation And Energy Efficiency Improvement Works Of The Cap Rio De Janeiro Building In Barcelona. Code: Cap-22240, Included In The Public Building Rehabilitation Promotion Program (Pirep), Within The Framework Of The Recovery, Transformation And Resilience Plan – Funded By The Eu. Next Generation Eu
Mag/Lca - Services For Planimetric Survey Work, Report With The Study And Analysis Of The State Of The Buildings And Annexes With An Executable Budget, Obtaining The Habitability Certificate, Energy Efficiency Certificate And Solidity Certificate Of The Set Of Buildings Located In The Area Of Santa Maria De Gallecs
Execution Of The Work “Reduction Of Energy Demand And Improvement Of Comfort In The Main Building Of The Escola De Ponts”.
Supply For The Improvement Of Ex Situ Conservation Of The Bgva.
Contracting Of Works Included In The Monumental Lighting Project For The Viana Town Hall Building. Recovery, Transformation And Resilience Plan - Financed By The European Union - Next Generation Eu.
Contracting Of Works Included In The Monumental Lighting Project For The Viana Town Hall Building. Recovery, Transformation And Resilience Plan - Financed By The European Union - Next Generation Eu.
Services Contract For The Technical Health And Health Coordination Of The Works Rehabilitation And Improvement Of The Energy Efficiency Of The Civic Center Of Sant Adrià De Besòs - La Mina.
Contracting Of Works Included In The Monumental Lighting Project For The Viana Town Hall Building. Recovery, Transformation And Resilience Plan - Financed By The European Union - Next Generation Eu.