104 Live Notices for Spain Photovoltaic Module Tenders
Showing 1 to 20
Announcement Of The Industrial And Energy Dependency Of The Government Subdelegation In Burgos, By Which The Requests For Prior Administrative Authorization, Administrative Authorization Of Construction And Declaration Of Public Utility Of The Photovoltaic Solar Plants "El Gallo", "La Zarzuela" And "The Shoemakers", Of 16.8 Mw, Of 13,685 Mw And Of 16.8 Mw Of Installed Power, Respectively, And Their Evacuation Infrastructure; For Its Hybridization With The Wind Farms «El Gallo», «La Zarzuela» And «Los Zapas», Of 49.4 Mw, 41.8 Mw And 49.4 Mw Of Installed Power, Respectively; All Of Them In The Province Of Burgos, Promoted By The Commercial «Cyl Energia Eolica, S.L.U.». Peol-Fv-176-Ac Code.
Resolution Of The Government Delegation In Aragon By Which The Lifting Of Minutes Prior To The Occupation Of The Farms Affected By The Pfot 155 Project Is Convened, Which Includes The Underground Electricity Line At 30Kv Between The Photovoltaic Facilities Fornax Ii And Fornax Iii And The Setation Setation Promoters Magallón 400/30 Kv, For The Evacuation Of The Photovoltaic Facilities Fornx Ii Iii, In The Municipal Terms Of Pozuelo De Aragón And Pedrola, In The Province Of Zaragoza.
Resolution Of The Government Delegation In Aragon By Which The Lifting Of Minutes Prior To The Occupation Of The Farms Affected By The Pfot 154 Project Is Convened, Which Includes The Underground Electricity Line To 400Kv For The Evacuation Of The Photovoltaic Installation Fornax I, In The Municipal Terms Of Pozuelo De Aragón, Magallón And Agón, In The Province Of Zargoza.
Works To Implement The Structural Actions Of The Program Of Promotion To The Rehabilitation Of Public Buildings In The I.E.S. Virgin Of Vico
The Provision Of Services Consisting In The Drafting Of The Construction Project And The Restoration Project Of The “Archaeological Excavation, Civil Works And Catwalks, Archaeological Restoration And Photovoltaic Solar Installation In The Site Of Fuente Álamo” As Well As The Subsequent Execution Of The Work By The Prtr Contractor Itself Of The Next-Generation Funds,
Works Contract Relative To The Installation Of Renewable Electricity Generation Infrastructure For Self -Consumption, Included In The Comprehensive Clean Energy Project Of The Municipality Of María (Dus 5000)
Drafting Project, Execution Work And Maintenance Of Photovoltaic Installation For Self -Consumption In The Building Arazuri (00000327_001)
Works To Implement The Structural Actions Of The Program Of Promotion To The Rehabilitation Of Public Buildings In The I.E.S. Virgin Of Vico Contract Financed With The Plan For Recovery, Transformation And Resilience At 100%. Program For Impulse To The Rehabilitation Of Public Buildings Of Ccaa And Eell “Pirep”
Drafting Project And Execution Photovoltaic Installation Work For Self -Consumpum In The Etap Tibbas (Am273268_01)
Shadowed And Photovoltaic Plates In The Port Of La Atunara
Execution By Lots Of Different Photovoltaic Facilities For Shared Self -Consumption In Municipal Buildings.
Directorate Of Works And Coordination Of Health And Safety For The Execution Of Nine Photovoltaic Facilities Of Shared Self -Consumption In Municipal Buildings.
Mixed Supply Contract With Photovoltaic Installation And Legalization Of The Same (Measure 2), Collected In The Comprehensive Clean Energy Project In The Municipality Of Los Cerralbos-Prtr (Nextneration Eu).
Supply Of 3 Self -Polompactors And Solar System For Implementation According To Technical Pliers
Installation Works And Photovoltaic Supply With Accumulation For The Comprehensive Clean Energy Project In The Municipality Of Alcampell - Prtr (Nextneration Eu).
This Is The Execution Of The Mixed Project, Of Supply, Work And Service, Called The Energy Community For The Shared Self-Consumption In The Duero-Douuro Territory, Which Aims To Perform Complete Photovoltaic Facilities, For Energy Production With A Modality Of Self-Consumption Shared With Surpluses In 40 Municipalities And Promotion Impulse Services
Project And Work Drafting For A Photovoltaic Installation Of Minimum Nominal Power 40 Kw On The Cover Of The "Las Balsas" Paterna Potable Tank
Supply And Work On The Installation Of Self -Consumption Photovoltaic Panels At The La Selva Composting Plant, Subject To Harmonized Regulation, Within The Framework Of The Recovery, Transformation And Resilience Plan - Funded By The European Union - Next Generation Eu.
This Is The Execution Of The Mixed Project, Of Supply, Work And Service, Called The Energy Community For The Shared Self-Consumption In The Duero-Douuro Territory, Which Aims To Perform Complete Photovoltaic Facilities, For Energy Production With A Modality Of Self-Consumption Shared With Surpluses In 40 Municipalities And Promotion Impulse Services
Pass-01/25 Equipment Supply Of Photovoltaic Central In Renting Mode (Lot 1) And Microwave Source And Wave Guides Up To Applicator In Lease Modality (Lot 2) For Waste Reduction Treatment Equipment And Water Recovery