93 Live Notices for Spain Road Construction Tenders
Showing 1 to 20
Road Safety Improvement A-3133. Section: Pk 26+930 To Pk 28+520. La Rambla
Road Safety Improvement A-3133. Section: Pk 26+930 To Pk 28+520. La Rambla
Improve Road Safety A-3133. Section: Km 26+930 To Km 28+520. La Rambla
Supply Of Construction Elements And Logistical Support For The Development Of Tasks On Public Roads And Municipal Facilities In Esparreguera.
The Purpose Of The Contract Is The Execution Of The Urbanisation Works Of The East Road Perimeter Of Plot 5 Of The Special Plan For Interior Reform Of Mercavalencia (Hereinafter Peri).
End Of Cycle-Pedestrian Road Improvement Road Safety A-8063 Tomares-Castilleja Cuesta
Forest Fire Prevention Works On The Properties Of The Forest Heritage Of The Autonomous Community Of Navarra
Tender Notice From: Adif - Presidency. Purpose: Execution Of The Works For The Construction Project Of The New Parla Norte Station (Madrid). New Access Road, Conditioning And Connection Point To The M-408 Road And Connections. File: 3.24/06110.0159.
Adaptation Of The Landscaped Areas, Roads And Pavements Of The Güímar Industrial Estate, In Order To Carry Out The Actions To Improve The Estate, All Of Which Are Included In The “Immediate Action Plan For The Güimar Industrial Estate”.
Repair And Maintenance Of Roads And Elements Of Public Roads In The City Of Sabadell
Service For The Drafting Of The Project And The Technical Management (Construction Management And Health And Safety Coordinator In The Execution Phase) Of The Work “Asphalting And Improvement Of Rural Roads, In The Municipality Of Tollos (2024.Pla.254)””
Execution Of The Works Contained In The Technical Project Called “Adaptation Of The Drainage System And Repair Of Damage Caused In The Access To Ibort From The N-330” (Tm Sabiñánigo).
Service For The Drafting Of The Project And The Technical Management (Construction Management And Health And Safety Coordinator In The Execution Phase) Of The Work "Construction Works Of Retaining Walls For The Consolidation Of The Road And Channeling Of Storm Drains On The La Cava Road, In The Municipality Of Alcalalí (2024.Pla.010)
Execution Of The Works Contained In The Technical Project Called "Replacement Of The Drainage System And Reconstruction Of Damaged Pavements In The Access To Asieso From The A-2605" (Tm Jaca)
Execution Of The Works Contained In The Technical Project Called "Reconstruction Of Damaged Ditches And Pavements In The Accesses To Population Centers In The Geographical Area Of Cornudella De Baliera" (Tm Arén)
Execution Of The Works Contained In The Technical Project Called “Replacement Of The Road Surface, Pavements And Drainage System In San Feliú De Veri” (Tm Bisaurri)
Execution Of The Works Contained In The Technical Project Called "Reconstruction Of The Drainage System And Damaged Pavements On The Hu-V-6104 Access Road To Hoz De Jaca" (Tm Hoz De Jaca)
Execution Of The San Sebastián-Hospital-Ávalos Ring Road (Phase 2). Connection Gm-1-Access Road To La Lomada-Lomo Del Clavo/Avalos
Construction Management And Health And Safety Coordination Of The Works For “Road Paving In The El Ballestar Urbanization”
R-142A/O. Platform Expansion And Specific Improvements On The Cv-470 Road. Las Cuevas-Loberuela Sections (Km 9+180 - Km 15+200)