149 Live Notices for Spain Solar Panel Tenders
Showing 1 to 20
9 Mwp Self-Consumption Photovoltaic Solar Installation Project "La Grulla", Municipality Of Palma Del Río (Córdoba), Within The Framework Of The Recovery, Transformation And Resilience Plan (Prtr)
Contracting Of The Execution Of Various Works In The Temporary Stay Centre For Immigrants (Ceti) Of Ceuta, Whose Actions Are Described In The Execution Project, There Being A Need For The Building To Be In Constant Operation During The Execution Of The Works.
Works Contract For The Photovoltaic Installation With Storage In The Municipality Of Albanyà, Through A Short Simplified Open Procedure
Installation Works Of A Self-Consumption Photovoltaic Plant On The Roof Of The Cold Water Tank Of The Mataró Water Green Tube Building
Contract For Works Included In The Construction Project Of The Municipal Brigade Building Of The La Riba City Council
Resolution Of The General Directorate Of Energy Of The Generalitat De Catalunya, By Which Blue Viking Linea, Sl, Is Granted The Prior Administrative Authorization, Administrative Construction Authorization, And The Declaration Of Public Utility Of The Project Of The Photovoltaic Solar Plant Called Aleixar With 2.085 Mw Of Installed Power On Non-Urbanizable Land, In The Municipality Of L'Aleixar, In The Region Of El Baix Camp And Its Evacuation Infrastructure, Which Consists Of A 25 Kv Line In The Municipality Of L'Aleixar, In The Region Of El Baix Camp (File Fue-2022-02940294; Ref. 02558).
Execution Of The Works Contained In The "Project For The Works Of Installation Of Pv For Self-Consumption Without Surplus For The Cr Del Páramo Bajo De León And Zamora In Villamañán (León).
Works And Services For The Installation Of Photovoltaic Panels On The Roofs Of Several Buildings, Photovoltaic Canopies, Photovoltaic Fields And Electrical Storage Systems On The Campus Of The University Of The Balearic Islands, Including Maintenance Of The Facilities, Within The Piteib, Within The Framework Of The Prtr, Financed By The European Union (Nextgenerationeu).
Execution Of Works Corresponding To The Project “Optimization In The Use Of Water Resources From Desalinated Water And Improvement Of Energy Efficiency Through Photovoltaic Solar Pumping And Energy Storage System For Aguas Del Almanzora, S.A. (Almería)”
Execution Of Works Consisting Of Thermally Insulating The Interior Of Various Municipal Buildings, Replacing And Installing More Energy-Efficient Interior Lighting, Installing Photovoltaic Panels And Replacing Inefficient Heating Systems With More Sustainable Aerothermal Technologies In Order To Comply With The Implementation Of The Aid Programme For Investments In Unique Local Clean Energy Projects In Municipalities With A Demographic Challenge (Program Dus 5000) Within The Framework Of The Regeneration And Demographic Challenge Programme Of The Recovery, Transformation And Resilience Plan, And With The Specific Objectives Of The "Comprehensive Clean Energy Project For The Municipality Of Pinós".
Supply And Rental Of Different Materials And Equipment For The Management And Development Of Training Actions Linked To The National Catalogue Of Professional Qualifications At State Level. Line Iii Aimed At Unemployed Workers. 2023 Call Regulated By Order Efp/1189/2023.
The Purpose Of This Contract Is The Mixed Contracting Of The Basic And Execution Projects, The Works, Site Management, Health And Safety Coordination; Supply, Installation And Preventive And Corrective Maintenance During The First 3 Years Of The Photovoltaic Solar Installations In The Los Cipreses Shopping Centre In Salamanca.
Contracting Of The Execution Of The Works Of The "Detailed Engineering Project For Photovoltaic Plants Integrated Into The Ops System Of The Port Of Bilbao" And Performance Of The "Comprehensive Operation And Maintenance Service".
Installation And Commissioning Of A Photovoltaic Installation For The Production Of Electrical Energy For Self-Consumption Through The Energy Community Model
Announcement By The Territorial Delegation Of Economy, Finance And European Funds And Industry, Energy And Mines In Almería, By Which The Request For Declaration Of Public Utility, Specifically, Of The "Psfv Tabernas 1" Photovoltaic Solar Park Project, Located In The Municipality Of Lucainena De Las Torres (Almería), Is Submitted To Public Information.
Correction Of Errors To The Announcement Of December 27, 2024, Of The Functional Area Of Industry And Energy Of The Government Delegation In Galicia, By Which The Request For Prior Administrative Authorization (Aap) And The Environmental Impact Study (Esia) Of The «Satrebares» Wind Farm With 125 Mw Of Installed Power, And Its Evacuation Infrastructure, In The Municipalities Of Guitiriz (Province Of Lugo), And Monfero, Abegondo, Aranga, Curtis And Oza-Cesuras (Province Of A Coruña), Promoted By The Company «Maracaibo Solar, Slu». File Reference: Peol-910.
Correction Of Errors In The Announcement By The Industry And Energy Department Of The Government Subdelegation In Granada, Which Submits To Public Information The Request For Declaration Of Public Utility Of The Caparacena 220 Photovoltaic Solar Plant, With An Installed Capacity Of 93.24 Mw And Its Evacuation Infrastructure In The Municipalities Of Moclín, Colomera And Atarfe In The Province Of Granada.
Mixed Contract For Works And Supply Of A Photovoltaic Solar Installation For Self-Consumption Without Surplus Connected To The 100 Kw “Ugao-Miraballes Town Hall – Sports Centre” Grid On The Roof; And To The 80 Kw “Ugao-Miraballes Town Hall – Leitoki School” Grid On The Roof, In Ugao-Miraballes (Bizkaia), Within The Framework Of The Recovery, Transformation And Resilience Plan – Financed By The European Union – Next Generation Eu.
Announcement By The Department Of Industry And Energy Of The Government Delegation In Castilla-La Mancha On The Public Information On The Application For Prior Administrative Authorization And Environmental Impact Statement For The Preliminary Projects For The Helena Solar 15, Helena Solar 16, Helena Solar 17 Photovoltaic Solar Plants Of 26.974 Mwp Each And Their 30Kv Medium Voltage Underground Lines To The La Cañada 30/220Kv Substation, In The Municipality Of Maqueda, In The Province Of Toledo.
Announcement By The Department Of The Functional Area Of Industry And Energy Of The Government Subdelegation In Guadalajara, By Which The Request For Declaration Of Public Utility Of The Cruceta Solar Photovoltaic Installation, With An Installed Capacity Of 42.94 Mw, And Its Evacuation Infrastructure, In The Municipality Of Horche, In The Province Of Guadalajara, Is Submitted For Public Information.