106 Live Notices for Finland Dam Construction Tenders
Showing 1 to 20
Drinking Water Rehabilitation Of The Reservoir On The Mas Tower
Supply And Delivery Of Construction Works
KWA NZOONGO EARTH DAM DEVELOPMENT AND LIVELIHOOD ENHANCEMENT PROJECT AS PER BOQ
Request For Expression Of Interest For The Procurement Of A Batching Plant And Supporting Equipment.
Td 55/2024 Construction Of One (1) Concrete Water Tank At The "Malia" Location Of The Stavrovouni Forest Of The Nicosia - Larnaca - Famagusta Forest Region
Rehabilitation Of Murambinda Mudanda Road
Municipality Of Aire Sur L'Adour Drinking Water Rehabilitation Of Reservoir On Mas Tower Operation N° 2021-012
Bidding For The Purchase Of Prefabricated Materials For Construction And Other Projects, 11 Items, Earthen Dams, Headworks And Buildings With Other Components, Lam Saphung Reservoir Project Under The Royal Initiative, Chaiyaphum Province (Skk.6 Khon Kaen) By Electronic Bidding Method.
Rehabilitation Works On The Control Mechanisms Of The Undurraga Dam Reservoir And Drainage
Repair Of The Gates Of The Peñaflor Dam And Entrance To The Source Section. Municipality Of Peñaflor (Seville)
Konya Tashkent Afshar Pond Refill
DEVELOPMENT OF RASAU WATER SUPPLY SCHEME (STAGE 2), SELANGOR DARUL EHSAN Package 6: Design and Build of Proposed New Ground Reservoir, Connecting Pipelines, Retrofitting Pipeworks, Access Roads at Bukit Tampoi; Treated Water Pumping Mains from existing Pipe Bridge at ELITE Highway to Bukit Tampoi Reservoir; and Associated Works.
Expansion of the Boubaneh reservoir with a capacity of 2000 cubic meters
C217 - Plaggen And Dam Improvement Of Holmer Teiche
Clearance Of Sand Trap Achmer
Hwsb Niegripp, Km 3,7 - 4,57 Holzung
Hwsm Schwarze Pockau In Pockau Construction Lot 7.2 And Construction Lot 8.3
Hwsb Niegripp, Km 3.7 - 4.57 Logging
Construction of ground water tank (200 cubic meters) and aerial water tank of 50 cubic meters) in Bandar Lange and Jinnah industrial towns and implementation of water distribution network phase of approximately 2500 meters length of Jinnah industrial town for 5 solar months.
RECRUITMENT OF AN INDIVIDUAL CONSULTANT FOR THE DEVELOPMENT OF A RESETTLEMENT ACTION PLAN (RAP) AS PART OF THE REHABILITATION OF THE DAM AND THE IRRIGATED PERIMETER OF MANNI FOR THE BENEFIT OF THE INTEGRATED DEVELOPMENT PROGRAMME