18 Live Notices for France Dredging Works Tenders
Showing 1 to 18
Works To Create A Reedulleum At The Confluence Of Tarn And The Moulines Stream In Castelnau-De-Lévis (81)
Maintenance Dredging Of The Channeled Scheldt In Grand Gabrit And The Sensée Canal
Hondschoote Pk 0+000 To Cleaning Work On The Pk 0+600
Hondschootepk 0+000 To Pk 0+600
Hondschoote Pk 0+000 To Cleaning Work On The Pk 0+600
Maintenance Dredging Of The Channeled Scheldt In Grand Gabrit And The Sensée Canal
Increase In The Eligible Water Tie Rods Of The Long -Term Quay And The Papeete Pass
Concession Of Works Relating To The Extraction Of Sediment Of The Crotoy Basin And Storage Lockers, To Treatment If Necessary For Their Valuation
Concession Of Works Relating To The Extraction Of Sediment Of The Crotoy Basin And Storage Lockers, To Treatment If Necessary For Their Valuation
Drawing Work To Restore Water From The Ports Of Ports And Access Channels On The Lake Of Parentis - Biscarrosse .
Drawing Work For Catering For Water Tiering Ports And Access Channels On Lake Parentis - Biscarrosse.
Port Of Lorient - Western And Channel Passing Passage
Concession Of Works Relating To The Extraction Of Sediment Of The Crotoy Basin And Storage Lockers, To Treatment If Necessary For Their Valuation
Concession Of Works Relating To The Extraction Of Sediment Of The Crotoy Basin And Storage Lockers, To Treatment If Necessary For Their Valuation.
Concession Of Works Relating To The Extraction Of Sediment Of The Crotoy Basin And Storage Lockers, To Treatment If Necessary For Their Valuation
Concession Of Works Relating To The Extraction Of Sediment Of The Crotoy Basin And Storage Lockers, To Treatment If Necessary For Their Valuation
Concession Of Works Relating To The Extraction Of Sediment Of The Crotoy Basin And Storage Lockers, To Treatment If Necessary For Their Valuation In This Context, The Concessionaire Will Ensure All Of The Project Management Missions: • Regulatory And Environmental Studies; • Land Missions Within The Framework Of Environmental-Tasting Compensations; • Installation Of Operating Equipment; • Realization Of Work; • Annual Monitoring And Assessment Of Maintenance And Operating Of The Site • Rehabilitation Of The Site At The End Of The Operation. The Concession Of Works Will Be Conditioned By An Obligation Of Result In Terms Of Deadline, Volume Of Desensibly On All Of The Pools In The Basin And The 9 Storage Lockers.
Framework Agreement For The Recovery Of The Hydraulic Capacity Of Rivers And Works Of The Smiage Territory