1589 Live Notices for France Engineering Services Tenders
Showing 1 to 20
Uvre Mastery For The Creation Of Alveole 2 And The Intermediate Coverage Of Alveole 1 Of Locker 4 Of The Isdnd
Project Management Mission For The Rehabilitation Of Buildings Located In Lomme And Roubaix
Project Management For The Attenuation Of Floods, The Renaturation Of The Ru Of Lochy And The Future Of The Lateral Canal Of The Grand Morin
Speramement Missions, Topographic Services And Detection For The Bayonne Prissé Heat Network - Application Phase.
Geotechnical Missions For The Construction Of The Bayonne Prisse Chairman'S Coorum - Application Phase.
Dsp Rcu.
Maintenance And Operation Of Cvc Thermal Installations.
The Objective Of The Consultation Is To Support The Partners In Order To: - To Build An Ecological Inventory (Inventories* And Functionalities), Hydraulic/Hydrographic (In Connection With Future Interregory/Cultiv’Jus -Agroecological Management Projects), Landscape, Agronomic, And Tourist Infrastructures Of The Ecological Corridor Connecting The Westhoek And Audomarois, First According To The Perimeter Of Intervention (§ 1.3), By Compiling Or Providing The Necessary Data,-To Develop A Global Ecological Planning Plan In The Form Of A Cartographic And Documentary Relationship According To The Ecotourism (Discovery), Educational, Environmental, Agro-Ecological And Hydrological Dimensions, So That Partners Have Concise Preliminary Drafts Allowing The Progressive And Operational Constitution Of A Corridor. Cross -Border. The Work Will Be Returned In The Form Of A Cartographic And Documentary Report And Will Allow Partners To Easily Constitute Before Summary Projects Allowing To Gradually And Operationally Implement The Master Plan.
The Design And Writing Of A Territorial Technical Notebook On The Scale Of The Biosphere Reserve Aims To Allow The Understanding Of The Evolution Of The Climate In Order To Produce A Diagnosis Of Vulnerability And To Analyze Later The Direct And Indirect Impacts On The Different Ecological And Socio-Economic Components Of The Territory Of The Biosphere Reserve. The Final Analyzes Must Highlight The Major Trends In Evolution And Possibly The Vulnerabilities That Will Be Necessary To Return And Share In A Simple And Educational Way With Citizens And Stakeholders In The Territory (Region, Departments, Local Authorities, Associations, Etc.). This Analysis Will Take The Form Of A Climate Notebook. This Document Will Include Climate Analysis And Its Evolution According To A List Of Indicators Pre-Identified By A "Methodology" Working Group That Is Part Of The Life Biospheradapt Project, And An Analysis Of Impacts On The Territory. The First Recipients Of This Climate Notebook Will Be The Technicians Of The Structures Identified By The Park As Part Of The Animation Of The Designation Of The Biosphere Reserve. It Will Also Be Accompanied By A "Summary For Decision -Makers", In The Form Of A Climate Story Of The Territory, Accompanied By Key Messages For Local Elected Officials. The Production Of A Popularized Document (Containing In Particular Infographics) From The Climate Notebook, Will Allow The Dissemination Of Popular Data For The General Public. Once This Climatic Notebook Has Been Completed, Popularized Information Will Be Shared With The Stakeholders In The Territory During The First Consultation Workshops Provided For In The Life Biospheradapt Project In Order To Build The Diagnosis Of Territory Vulnerability.
The Purpose Of This Market Is To Carry Out A Health And Health Protection Coordinator Mission, Category 2, As Part Of The Rehabilitation Of Wastewater Sanitation Networks In The Municipality Of Fouilloy (80800).
Periodic And Regulatory Checks Of Technical Installations
This Consultation, Passed In Application Of Articles R. 2111-1 To R. 2111-11 Of The Public Procurement Code And R. 2162-1 To R. 2162-14 Of The Public Procurement Code (Decree N ° 2018-1075 Of December 3, 2018 Relating To The Regulatory Part Of The Public Procurement Code) Aims To Conclude A Mono-Attribute Framework Agreement And Pedestrian Along The 47B Departmental Road
Appointment Of A Maritime Carrier For The Transport Of South African Dock Titan In Reunion
Project Management For The Rehabilitation Work Of The Aubette-Gambetta Book
Project Management For The Rehabilitation Extension Of The Resuscitation Service Of The Elbeuf Hospital Center.
Project Management - Modernization Of The Sorting Center
Technical Control Missions And Sps Coordination - Reconstruction Project Of The Ehpad Slides Flowers By Extension Of The Cher Sologne Ehpad In Selles Sur Cher.
Missions Of Coordinator In Security And Protection Of Workers' Health (Csps) And Technical Controller For The Real Estate Operation Construction Of Building O For The Omp -Uni.
Project Management Mission For The Rehabilitation Of The Chabotte Treatment Plant.
Project Management Relating To The Security Work Of Drinking Water Structures