Provision of Construction of four (04) boreholes in the processing units of Dano, Léo, Legmoin and Sidéradougou for the benefit of the Small Irrigation project in the Greater West and the Eastern region (PIGO Plus)
Provision of protecting bridges and dredging the Ismailia Canal 7 in the distance from 7 to 102.0 km
Provision of protecting bridges and dredging the Ismailia 6 Canal in the distance from 98.00 to 102.00
Provision of protecting bridges and dredging the Ismailia Canal 5 in the distance from )5( to 93.8 to 98.00
Provision of protecting bridges and dredging the Ismailia Canal 1 in the distance from 89.6 to 93.8 km
Provision of protecting bridges and dredging the Ismailia 3 Canal in the distance from (3) to 85.4 to 89.6
Provision of protecting bridges and dredging the Ismailia 2 Canal in the distance from L 81.2 to L 85.4
Provision of protecting bridges and dredging the Ismailia 1 Canal in the distance from 77.0 to 81.240
Replacement and renewal of covered drainage networks For the Mit Rabia “A” area, with an area of 1,533 acres
Replacement and renewal of covered drainage networks For the Sirs Al-Layyan area, with an area of 2,578 acres
Replacement and renovation of 15 outlets at the end of a canal in Sohag Governorate (12) Circles on the Kasra Bank (13) The Ottomans on the Girga Bank
Replacement and renovation of 15 outlets at the end of a canal in Sohag Governorate (5) Al-Najjar branch of Girga Bank (6) Ramla branch on Girga Bank
Replacement and renovation of 15 outlets at the end of a canal in Sohag Governorate (14) The barrier on the Akhmim sea drain (15) The shepherd on the Akhmim sea bank
Replacement and renovation of 15 outlets at the end of a canal in Sohag Governorate (7) Al-Rashayda branch of Girga Bank (8) Branch 1, Al-Aqoubiya, on the Girga Bank vv(9) Deir el-Bahari on the Girga Bank (10) The southern monastery on the Girga bank (11) Branch 1, Al-Ruwaiheb, on Al-Kasra Bank
Replacement and renovation of 15 outlets at the end of a canal in Sohag Governorate (1) The way to the endowment wells bank (2) Chips on the main Sohag Bank (3) West of Al-Kasra on the main Sohag drain (4) Al-Mashawda branch on Girga Bank
Replacement and renovation of the covered drainage network for the first West Bats area “A”, area of 2606 acres
Replacement and renovation of the K 6.00 bridge on the Atwa drain In the General Administration Department of Drainage of North Dakahlia
Establishing a sewage network, a lift station and a discharge line in Deir Atiyah village
Implementation of the treatment works of the bridges of the Triangle Bank In the distance from the outlet kilometer to kilometer 0.500 in the river
Consulting Services for Implementation Consultant services for digitalization of basic education and TVET in Jo