Similar tenders from other countries.
Showing 1 to 20
Current Repairs To The Ccs-T Facilities Within The Radius Of The Ct2 Bacău Section - The Bla Facility On The Itești - Bacău Distance And The Ced Facilities In The Itești, Bacău And Roman Ced Stations
Ipswich Signal Cabin Reconstruction And Revitalisation
Procurement Of Capacitor (A) 35Wv 68000 Mf = 6 Nos, (B) 160Wv 12000 Mf = 20 Nos,(C) 80Wv 22000 Mf = 06 Nos, (D) 350Wv 6800 Mf = 14 Nos Ssae/Sig/Lkm & Cml Section. These Capacitor Will Use In Various Railway Station For Ups And Distribution Panel In Signalling Power System.
Ipswich Signal Cabin Reconstruction And Revitalisation
Design And Execution Of Works For The Task Entitled Revitalization Of Railway Line No. 108 On The Jasło - Nowy Zagórz Section As Part Of The Project Entitled "Revitalization Of Railway Line No. 108 On The Jasło - Nowy Zagórz Section Together With The Construction Of The Jedlicze - Szebnie Railway Link"
Competition With Negotiation
Drafting Of Construction Project And Execution Of Works For The Renovation Of Security Facilities At Alcover Station.
Increasing The Economic Efficiency And Railway Safety By Increasing The Level Of Centralization Of The Railway Signaling Facilities - 8 Lots: Lot 3 - Cf Brașov Regional Branch (Design And Execution) Sublot 1 - Răzbioni - Târgu Mureș - Cf Line 316 Deda - Răzbioni; Sublot 2 - Sibiu – Vințu De Jos – Line Cf 210 Sibiu – Vințu De Jos.
Announcement By The Public Business Entity Railway Infrastructure Administrator (Adif), Announcing The New Dates For The Contracting Procedure For "Drafting Of The Construction Project And Execution Of The Works Affecting Control, Command And Signalling Resulting From The Duplication Of The Track Between La Carrera Pola De Siero". (File: 3.23/07504.0080).
Reconstruction Of The Vlkov U Tišnov Railway
Construction Of A New Radom Południowy Stop At L. K. No. 8 And 22” As Part Of The “Governmental Program For The Construction Or Modernization Of Railway Stops For The Years 2021–2025” And Execution Of Works For The Task: “Expansion Of The County Road – Ul. Walentynowicz In Radom Consistent With The Construction Of A Pedestrian Bridge Over The Southern Bypass
Preparation Of Design Documentation And Execution Of Construction Works As Part Of The Project "Works On Railway Line No. 132 On The Pyskowice - Opole Groszowice Section"
Drafting Of Construction Project And Execution Of Works To Remove Telephone Blockage Between Ribadeo And Cudillero
Drafting Of Construction Project And Execution Of Works Affecting Control, Command And Signalling Resulting From The Duplication Of Track Between La Carrera – Pola De Siero
Maintenance Of Signaling Installations - Tramway Network.
Mt9 - Railway Signaling Works Market For The New Transport Lines Development Operation.
5010018272-Design, Supply, Assembly And Maintenance Of Control-Command And Signaling Systems For Various Sections Of The National Railway Network.
Maintenance Of Srk Devices Included In The Railway Infrastructure Managed By Dsdik In Wrocław, Divided Into Tasks
Mp-Leb 2024.09.209 Bercher Garage-Workshop Is Mandate Phases 32 To 53
Reconstruction Of The Vlkov U Tišnov Railway