Deicing Chemicals For Airfield And Mfh Street
PROPOSED REPLACEMENT OF JOINT SEALANT AT TAXIWAY & APRON AREA AND ITS ASSOCIATED WORKS AT SULTAN ABDUL AZIZ SHAH AIRPORT, SUBANG, SELANGOR
L0GISTICS(a.Crane hire and lifting equipment services, b.Customs Clearing Agents, c. Removal services (relocation) ,d.Vehicle Hire services, e.Courier services)
SUPPLY AND INSTALLATION OF WINDSOCK AND WINDSOCK ASSEMBLY
Provision of Ground Handling Services for Vietnam Airlines’ flights at HKG for the period from August 2025 to July 2028
(Renewal) Vt-1205/25-Kt-Tth-Lifting Equipment
Supply, Delivery And Testing Of Spare Parts For Pteris Global Baggage Handling System At Gbia
Supply, Delivery, Installation, Testing And Commissioning Of Baggage Handling System At Domestic Terminal Building (Arrival Hall) Of Gbia
E90094/51/0-Dion7/2025, 3425 Langenlebarn, Flh Figl-Flpl Pabisch, 000, Newer 2 Hangar With The Velvet Velvet; Total Entrepreneurial Services
Yinchuan Airport Shuttle Bus Procurement Project - International Tender Announcement
Peaking Small Hydros Lifting Equipment Statutory Inspections 5 Years
Maintain Airfield And Markings
Supply In Operational State Of Technical And Auxiliary Furniture In Control Centers
Supply In Operational State Of Technical And Auxiliary Furniture In Control Centers
Tsaile Helipad Construction
Contractor-Owned /Contractor Operated And Government-Owned/ Contractor-Operated, And (Coco/Goco) Fuel Operations At United States Army Garrison, Hi (Usag-Hi) For Schofield Barracks And Wheeler Army Airfield (Wheeler Aaf).
Design/Build Construction For A New C130J Tension Membrane Hangar At Air Station Barbers Point (Asbp), Kapolei, Hi - Opportunity Limited To Nmacc Iii Pool 1 Idiq Contract Holders Only
Peaking Small Hydros Lifting Equipment Statutory Inspections 5 Years
Apo 056 2025 - Remedation Of Deficiencies In Airport Facilities Of The Bat
Hiring The Service For The Formulation Of The Proposal And Implementation Of Solutions Based On Nature And Natural Infrastructure In The Machangara Microbasin