"Construction Of Water Supply And Sewage Systems In The Area Of Południowa, Kanarkowa, Słowikowa, Paulinowska Streets In Sucha Górna." 45231300-8
Carrying Out Construction Inspections Of The 15/0.4 Kv Station And Lv And Mv Lines In The Szamotuły Distribution District In 2024
Rd6 Pe Gniezno – Modernization Of The Roof Covering And Sheet Metal Work In Building B Pe
Modernization Of The Lv Overhead Line From Station No. 02-903, Circuit No. Iv In Lwówek, Ul. Ratuszowa
Connection Of Nn-0.4 Kv Circuits Derived From 15/0.4 Kv Transformer Stations No. 02-1356 And 02-517 In Sierosław Town, Ul. Leśna/Bukowska.
Lv-0.4 Kv Cable Connection Between 15/0.4 Kv Transformer Stations No. 02-1130, 02-1002 And 02-1777 In Oborniki
Delivery Of Unmanned Aerial Vehicles For The Needs Of Enea Operator
Reconstruction Of A Section Of The 0.4 Kv Lv Overhead Line In Świniary, Kłecko Commune - Station 06-183 Świniary A, Circuit Ii, From The Station To Stand Ii/16; S-2024-12160
Construction Of An Electricity Grid For The Purpose Of Connecting The "Sława 5" And "Sława 6" Photovoltaic Power Plants To The Grid, Plot No. 739/18, In The Town Of Sława, Sława Commune
Purchase Of A Catalyst For The Hitachi Zx870 Machine For Pge Giek S.A. Branch Of The Bełchatów Brown Coal Mine
Purchase Of Batteries For Pge Giek S.A. Branch Of The Bełchatów Brown Coal Mine
Removal Of Liquid Waste For Pge Giek S.A. Branch Of Opole Power Plant
Purchase Of Shell Tellus S2Vx46 And Renolin Unisyn Clp 220 Sp Oils For Pge Giek S.A. Branch Of Bełchatów Power Plant
Supply Of Energy Padlocks For Pge Dystrybucja S.A. Rzeszów Branch
Connection Of A New Electricity Recipient: 1) Plk - Control Room, Platform Lighting Górki Noteckie Zms 33892 Os. Północny, 2) Eor Power Supply - Biskupice Wielkopolskie Gm. Pobiedziska Zms:50559
Preparation Of Technical And Legal Documentation For The Connection Of Contractors’ Facilities To The Distribution Network, Divided Into 5 Tasks Of Re Wyszków: Commune Of Węgrów, Sokołów Podlaski, Sterdyń, Klembów, Ostrów Mazowiecka.
Afl And Al Cables
Preparation Of Technical And Legal Documentation For: 1) Cybulice Małe (24-01424, 24-01425, 24-01426, 24-01427, 24-01428, 24-01429, 24-01430) 2) Serock (24-00633, 24-00645) 3) Chotomów (24-02013) 4) Legionowo (24-00980)
Preparation Of Technical And Legal Documentation For The Reconstruction Of A Section Of The Existing Mv And Lv Line: Task 1) Stanisławów Pierwszy, Task 2) Łomianki Brzegowa, Task 3) Trzciany.
Preparation Of Technical And Legal Documentation: 1 Pomiechówek (24-00781) 2 Arciechów (24-00806) 3 Borki (24-02287) 4 Skubianka (24-02855, 24-02856, 24-02857, 24-02858, 24-02859, 24-02861, 24-02862, 24-02863, 24-02864, 24-02865, 24-02866, 24-02867, 24-02868, 24-02869, 24-02870, 24-02871, 24-02872, 24-02873, 24-02879, 24-02881, 24-02883, 24-02887, 24-02888, 24-02889, 24-02890, 24-02891, 24-02892, 24-02893