Cft-1764 - It Consultancy For Content Management
Civil Engineering Works For The New Playground At Merl Park In Luxembourg-Hollerich
Electrical Engineering Start Of Work: 08/2025 Duration Of The Work: 120 Working Days (With Interruptions), 4-6 People
Supply Of Road Fondants For The Winter Treatment Of Public Roads Of The Dvl Winter Season 2025/2026
The Municipal Administration Of Betzdorf Provides For The Construction Of Four Blocks Of Buildings In The Rue D'Olingen In Betzdorf Comprising 30 Apartments, One Office And Common Spaces. The Buildings Complex Consists Of A Fully Furnished Basement, Including Parking Spaces, Laundry Rooms, Ancillary Cellars And Technical Rooms. 200 Doors And Accessories As Well As Various Works.
The Municipal Administration Of Betzdorf Provides For The Construction Of Four Blocks Of Buildings In The Rue D'Olingen In Betzdorf Comprising 30 Apartments, One Office And Common Spaces. The Buildings Complex Consists Of A Fully Furnished Basement, Including Parking Spaces, Laundry Rooms, Ancillary Cellars And Technical Rooms. 1000M² Of Wall Tiles, 3000M² Of Floor Tiles And Various Accessories.
The Municipal Administration Of Betzdorf Provides For The Construction Of Four Blocks Of Buildings In The Rue D'Olingen In Betzdorf Comprising 30 Apartments, One Office And Common Spaces. The Buildings Complex Consists Of A Fully Furnished Basement, Including Parking Spaces, Laundry Rooms, Ancillary Cellars And Technical Rooms. 10,000 M² Of Paintings On Walls, Paints On Ceilings, Various Markings And Floor Paintings To Be Made.
As Part Of The Extension And Compliance Project Of The Luxembourg Crematorium - Locksmith Work
Civil Engineering Works In Rue Laduno In Erpeldange-Sur-Sûre
Extension Of The Maintenance Of Ibm, Lenovo Equipment And Licenses And Their On -Site Support
Acquisition Of Extron Audiovisual Equipment For The New National Intervention Center For The Grand-Ducal Police
Acquisition Of Service Vehicles Of Patrol, Trivialized And Administrative For The Needs Of The Grand-Ducal Police
The Luxembourg State Represented For This Market By The Ministry Of Health And Social Security (M3S) Is Launching A Procedure For Awarding A Public Market To Select A Service Provider To Ensure Support Services In The Implementation And Management Of The "Digitalization In Health - Implementation Of Regulation (Eu) 2025/327 Relating To The European Health Data Espace (Eds).
2484-2551 - Painting Work - Construction Of 5 "Wëltgebond" Apartments Buildings Lots 50 And 51 In Mamer
Lot 10 - Metal Exterior Joinery Foreseeable Start Of Work: 16.06,2025 Duration Of The Work: 60 Working Days (Work To Be Carried Out In Different Phases Divided Between 2025 And 2027 Non -Continuous And With Folding Of Site Installation
Construction Work
Wdvs Insulating Facades Work
Volume Of Work: Hydrocarbon Coated: 5,350 Tb; Borders Pose: 1400 M; Place Of Cobblestones: 1,700 M, Stabilization Of Career Crusions: 1450 T
Interior Doors Wood And Metal, Wardrobe, Integrated Cabinets And Wood Railings With Handrails The Start Of The Work Is Planned For 08/10/2025 The Duration Of The Work Is 27 Working Days
Framework Work, Insulation And Natural Slate Covers: New Building: 460 M2 Building To Be Transformed (Classified Inp): 400 M2