Similar tenders from other countries.
Showing 1 to 20
Rfq 1220-2025-3625 - James Waste Water Treatment Plant - Trickling Filter - Media Packs - Supply & Delivery
Supply, Installation, Testing And Commissioning Of Air Conditioner, Online Ups And Submersible Mud Pump At Karnaphuli Water Treatment Plant-1, Chattogram Wasa, Pomra, Rangunia, Chattogram.
Replacement Of Ac Pipes And The Refurbishment Of Water Treatment Works (Wtw) In Komatipoort For Nkomazi Local Municipality
Bidding Package No. 02Xl-Sxkd-2025: Underground Erosion Treatment Through The Right Shoulder Water Drainage System
Bidding Package 11: Consulting On Design Drawings And Construction Cost Estimates
Idiq Satoc For Small Construction Requirements At Csl Compalapa, El Salvador (Central America)
Cooling Water Test And Treatment Preventive Maintenance Services
Water Treatment In Bullville, Ny
N--Parkwide Vfd Replacement
Quimpac De Colombia S.A
Research Service Waste Water Treatment Plant (Ptar) Destined For Centralized Units To Be Executed 2025 ".
Provision Of The Certified Service Of Studies And Water Analysis Of The Wastewater And Drinking Water Treatment Plants (Ptap - Ptap) For Administratively Centralized Units
Acquisition Of Endowment Of Personal Protection Elements (Ppe) For Operators Of The Maintenance Squad And The Drinking Water Treatment Plants And Wastewater Of The U
Coordination Mission In Mature Mattress And Health Protection For The Realization Of A Drinking Water Treatment Plant In The Town Of Saint Cyr Sur Loire / Menardiere Site
Construction Of An Ime, Sessad And Two Boarding Schools In Saint-Sébastien-Sur-Loire (44)-Adapted Procedure For Small Lots
Request For Information Customs Laboratory Operation Purchase Of Pure Water / Water Purifying Systems
Replacement Of Ac Pipes And The Refurbishment Of Water Treatment Works (Wtw) In Komatipoort For Nkomazi Local Municipality
Provision of Rehabilitation of PLC Panels Attached to Gallella Water Treatment Plant
Supply, delivery and off-loading of submersible grit pumps at the Waste Water Treatment Works, as and when required for a period of three years
Supply, delivery and off-loading of submersible drainage pumps at the Waste Water Treatment Works, as and when required for a period of three years