24 Live Notices for India Insulation Work Tenders
Showing 1 to 20
Wb/Jal/Drcs/1/3
Work Of Removal, Supply And Application Of Spray Insulation Of Steam Turbines And Its Allied System Of 210 Mw Unit No.3, 4, 5 At Gtps On As And When Required Basis
Spanner Combination Pack Of 23 , Torque Wrench ,Electrical Insulation Rubber Mat Size 1X1 Meter , Heavy Dutydouble Wheeled Bench Grinder , Electric Change Overswitches 100A 415V 4 Pole , High Voltage Resistantelectrician Work Gloves , Electric Planer 650W , Metal Drillbit Set Of 10Pc , Electric Impact Drill Machine 600W , Dcvoltage Detector For Veh , Digital Vernier Caliper 0 To150Mm , Measuring Tape , Ac Dc Clamp Meter Quantity: 18
Tbhes
Re-Insulation Work Of Whrb And St Area At Kawas Gas Power Project.
Re-Insulation Work Of Whrb And St Area At Kawas Gas Power Project.
Duct Modification Work Of Patient Party Meeting Room At 2Nd Floor And Insulation Work At 8Th Floor Corridor Of Ot 1 And 2 Of Trauma Care Centre And Installation Of Fcu For One Cabine At 2Nd Floor Of Private Cabine In The Premises Of Ipgme&Rsskm Hospital, Kolkata.
Tender For Existing Chimney Painting Work And Dg Tank Hot Insulation Work At Cold Chain Patalganga
Antifreezing Augmentation Of Gwss Chango As Winter Water Supply In Chango Sub Tehsil Hangrang Distt Kinnaur
Hiring Of An Agency For Insulation Work Over Hvac Pipelines
Supply and fixing of geyser at guest house NEW
Annual Work Contract For The Work Of Supply And Application Of Insulation In Boiler And Turbine Area Of 2X660Mw Unit 5 &Amp 6 At Csctpp, Chhabra
Custom Bid For Services - Hiring An Agency For Supply Andinstallation Work Of Insulation Over Different Size Chilledwater Pipe Line Quantity: 1
Dual Brake Valve , Clutch Booster Pipe Connector ,Insulation Tape , Checking Of Entire Loom Finding Out Theproblems, Loom Reparing With Necessary Components Withlabour Chrages , Mechanical Labour Charges For The Removalof Old Items And Fitment With New Spares Parts , Clutch Plate, Pressure Plate , Release Bearing , Water Pupmp Assy ,Anabond Paste , Clutch Booster Assy , Rotary Switch ,Overhauling Of Fuel Feed Pump , Benjo Union , Fuel Pipe Linecleaning, Fuel Filter Cleaning And Mechanical Labour Chargesfor Fitment Of New Spares Parts , Gear Lever End , Gear Boxtop Selector Shaft Adjustment And Mechanical Labourcharges For Fitment Of New Spare Parts , Lathe Work Of Gearbox Top , Gear Box Removal, Stripping, Rectification Of Topgear Sloppage With Necessary Spare Parts, Resaaemblingand Refting With Labour Charges , Clutch Pipe Connector ,Cannibilzation Of Clutch Pipe From Class V Veh Andmechanical Labour Chrages , Air Dryer Assy Quantity: 31
Blacktopping & Draiange
Construction Of Biological Pits At Bfda, Phuentsholing For The Fy 2024-2025
Construction Of Two Biological Pit At Phuentsholing For The Fy 2024-2025
Blacktopping & Draiange
Construction Of Waste Drop-Off Center At Rinchending
Improvement Of Farm Road From Ladrong To Yumchey & Pam Under Jarey Gewog