Toggle Offcanvas
...
 
Global India Photovoltaic Module Tenders

India Photovoltaic Module Tenders

Bid on readily available India Photovoltaic Module Tenders with GlobalTenders, the biggest and best online tendering platform, since 2002. Globaltenders.com offers an unmatched database of Photovoltaic Module tenders from India, more than any other platform. Daily, new procurement opportunities for Photovoltaic Module are uploaded from thousands of sources including all Indian official websites, Indian municipal websites, Indian newspapers and journals.

Bidding for Photovoltaic Module tenders in India is extremely lucrative for companies of all sizes. India tendering authorities release contracts for most of the Photovoltaic Module products and services procured by them. The most popular categories are -

  • India photovoltaic module tenders
  • India pv module tenders
  • India solar photovoltaic tenders
Sign up to get instant access to unlimited India Photovoltaic Module Tenders with advanced search filters, market analysis, industry trends, tender training and 24/7 customer support. India Photovoltaic Module market analysis, India Photovoltaic Module industry trends, India Photovoltaic Module tender training and 24/7 customer support.

30 Live Notices for India Photovoltaic Module Tenders

Showing 1 to 20

Bid For Supply Of Various Electrical Spares At 5 Mw (Ac) Solar Photovoltaic Grid-Connected Power Plant At Gujarat Solar Park, Village: Charanka, Taluka: Santalpur, Gujarat
country India
posting date05 Apr 2025
deadline22 Apr 2025
Off - Grid Solar Photovoltaic (Pv) Power Plant (V2) (Q3) Quantity: 1
country India
posting date05 Apr 2025
deadline14 Apr 2025
Construction Of Academic Cum Administration Building, Hostel Building, 1 No. Stp, Ug Sump, Pump Room, Electrical Sub-Station Along With All Necessary Infrastructure Facilities Including Internal Water Supply, Sanitary Installation, Internal Electrical Installations, Firefighting And Fire Alarm System, Vrv/Vrf System, Lifts, Networking, Solar Photovoltaic Power Generation, Cctv, Dg Set, Solar Water Heating, Ups, Ip Based Epabx, Signages, External Services Connection Of Civil And Electrical, Internal Cement Concrete Pavement Roads, Footpath, Storm Water Drainage, Etc. For Iiit Surat At Kholvad, District-Surat (Gujarat) In Engineering, Procurement And Construction (Epc) Mode-I.
country India
posting date05 Apr 2025
deadline30 Apr 2025
Off - Grid Solar Photovoltaic (Pv) Power Plant (V2) (Q3) Quantity: 1
country India
posting date03 Apr 2025
deadline12 Apr 2025
Off - Grid Solar Photovoltaic (Pv) Power Plant (V2) (Q3) Quantity: 1
country India
posting date01 Apr 2025
deadline11 Apr 2025
Off - Grid Solar Photovoltaic (Pv) Power Plant (V2) (Q3) Quantity: 1
country India
posting date29 Mar 2025
deadline08 Apr 2025
Construction Of Academic Cum Administration Building, Hostel Building, 1 No. Stp, Ug Sump, Pump Room, Electrical Sub-Station Along With All Necessary Infrastructure Facilities Including Internal Water Supply, Sanitary Installation, Internal Electrical Installations, Firefighting And Fire Alarm System, Vrv/Vrf System, Lifts, Networking, Solar Photovoltaic Power Generation, Cctv, Dg Set, Solar Water Heating, Ups, Ip Based Epabx, Signages, External Services Connection Of Civil And Electrical, Internal Cement Concrete Pavement Roads, Footpath, Storm Water Drainage Etc. For Iiit Surat At Kholvad, District-Surat (Gujarat) In Engineering, Procurement And Construction (Epc) Mode-I
country India
posting date29 Mar 2025
deadline23 Apr 2025
Installation Of Solar Drinking Water Tank With Iron Removal Plant With Photovoltaic Solar Pannel System At Daibhangi New Primary School At Daibhangi Under Hazrahat-I Gp
country India
posting date27 Mar 2025
deadline10 Apr 2025
Setting Up Of 500Mw Automatic Solar Photovoltaic Spv Module Manufacturing Line On Turnkey Basis At Iti Limited Naini Prayagraj
country India
posting date27 Mar 2025
deadline17 Apr 2025
Setting Up Of 500Mw Automatic Solar Photovoltaic (Spv) Module Manufacturing Line (On Turnkey Basis) At Iti Limited, Naini, Prayagraj
country India
posting date27 Mar 2025
deadline02 May 2025
Off - Grid Solar Photovoltaic (Pv) Power Plant (V2) (Q3) Quantity: 1
country India
posting date27 Mar 2025
deadline07 Apr 2025
Off - Grid Solar Photovoltaic (Pv) Power Plant (V2) (Q3) Quantity: 1
country India
posting date27 Mar 2025
deadline05 Apr 2025
Off - Grid Solar Photovoltaic (Pv) Power Plant (V2) (Q3) Quantity: 1
country India
posting date27 Mar 2025
deadline07 Apr 2025
Design, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING 10 KWP ON-GRID ROOF TOP SOLAR POWER PLANT ALONG WITH RELATED CIVIL WORK AT INDIAN OVERSEAS BANK, CURRENCY CHEST & KOCHI BRANCH LOCATED INERNAKULAM.
country India
posting date27 Mar 2025
deadline07 Apr 2025
Tender For Supply, Installation And Commissioning With 5 Year Cmc Of Grid Connected Solar Photovoltaic Systems On Goverment Hostels, Adarsh Nivasi Schools And Dr. Babasaheb Ambedkar Bhavan In The State Of Gujarat
country India
posting date26 Mar 2025
deadline17 Apr 2025
Execution Of Cleaning Solar Photovoltaic (Spv) Panels And Allied Works In Districts Gopalganj, Siwan, Saran, Kishanganj, Banka And Bhagalpur In The State Of Bihar
country India
posting date26 Mar 2025
deadline09 Apr 2025
Execution Of Cleaning Solar Photovoltaic (Spv) Panels And Allied Works In Districts Gopalganj, Siwan, Saran, Kishanganj, Banka And Bhagalpur In The State Of Bihar In Connection With The Job Design, Supply, Installation, Testing, Commissioning With Comprehensive Maintenance Contract (Cmc For 5 Years) Including Remote Monitoring System (Rms) Of Smart Solar Street Light System On The Identified Existing Electric Pole Under Mukhyamantri Gramin Solar Street Light Yojana In Bihar.//// बिहार राज्य के गोपालगंज, सिवान, सारण, किशनगंज, बांका और भागलपुर जिलों में सफाई सौर फोटोवोल्टिक (एसपीवी) पैनलों और संबद्ध कार्यों का निष्पादन, कार्य डिजाइन, आपूर्ति, स्थापना, परीक्षण, व्यापक रखरखाव अनुबंध (5 वर्षों के लिए सीएमसी) के साथ कमीशनिंग, जिसमें बिहार में मुख्यमंत्री ग्रामीण सौर स्ट्रीट लाइट योजना के तहत पहचाने गए मौजूदा बिजली के खंभे पर स्मार्ट सौर स्ट्रीट लाइट सिस्टम की रिमोट मॉनिटरिंग सिस्टम (आरएमएस) शामिल है।
country India
posting date26 Mar 2025
deadline09 Apr 2025
Off - Grid Solar Photovoltaic (Pv) Power Plant (V2) (Q3) Quantity: 1
country India
posting date25 Mar 2025
deadline03 Apr 2025
Sitc Of 2V 600 Ah Lead Acid Type Stationary Cells With Tubular Positive Plates For 100 Kwp Solar Photovoltaic System
country India
posting date25 Mar 2025
deadline15 Apr 2025
20 Kwp Grid Connected Solar Photovoltaic System , Solarbos Items Quantity: 2
country India
posting date25 Mar 2025
deadline04 Apr 2025

Share Share this page