Similar tenders from other countries.
Showing 1 to 20
Rfq-G1042024
"Inv - 2/2022 Execution Of Works For Investment Objectives Under The Administration Of Anif, Within The National Program For The Rehabilitation Of The Main Irrigation Infrastructure In Romania, For Investment Objectives: 5 Lots"
Resilience Engineering Of Existing Water Storage Tanks And Reservoir Structures And Ancillary Facilities In The Dry Irrigation Area Of Mingjian Township, Baguashan (First And Second Work Areas)
Resilience Project Of Existing Water Storage Tanks And Reservoir Structures And Ancillary Facilities In The Dry Irrigation Area Of Mingjian Township, Baguashan (S3 Zhongchi Work Area)
Resilience Project Of Existing Water Storage Tanks And Reservoir Structures And Ancillary Facilities In The Dry Irrigation Area Of Mingjian Township, Baguashan (S3 Lower Pond Work Area)
The Works Are Qualified As Urban Public Space Development Works, According To Article 232.1.A), Regulated In Article 13 Of Law 9/2017, On Public Sector Contracts. Location: Affects Part Of Soler I Cortada Street And The Sidewalk Of Sant Joan Despí In Cornellà De Llobregat. This Phase 2 Corresponds To The Green Areas Defined In The Reparcelling Project Of The Sidewalk On The North Side Of Soler I Cortada Street, The North Sidewalk And The Section Of Road That Connects The Sidewalk Of Phase 1 With That Of Phase 2. Approximately 1,366.79 M2. The Works Consist Of The Following Chapters: - Demolition And Earthmoving. - Paving. - Sewerage Network. - Lighting. - Urban Furniture. - Health And Safety. - Irrigation And Landscaping Network. - Gas Network. - Telephone Pipeline (Civil Works) (*). - Low Voltage Undergrounding. - Signaling. (*) Due To The Needs Of The Property Of The Reparcelling Community, Some Items Of This Chapter Have Been Executed In Advance, Which Procornellà Reserves The Right To Exclude From The Object Of Execution, Without The Right To Compensation Or Restitution By The Successful Bidder. This Modification Of The Modified Urbanization Project Of Polígon 3 Carrer Soler I Cortada Phase 2, Was Initially Approved On July 26, 2024 And Any Changes That Need To Be Introduced To Obtain Definitive Approval Will Be Assumed By The Contractor With Application Of The Accepted Unit Prices Or By Setting These Contradictory. Procornellà Will Only Pay For The Works Carried Out, Based On Duly Completed Work Certifications. The Successful Bidder Will Assume The Costs Of Waste Management, The Drafting Of The Health And Safety Plan And The Application Of Health And Safety Measures, Following The Instructions Of The Health And Safety Coordinator.
Assembly Work On Pvc, Corrugated Pe And Ductile Iron Pipes For The Comprehensive Modernisation Project Of Irrigation Community No. V Of Bardenas Irrigation (Zone 1) (Zaragoza).
Bidding For The Purchase Of Laterite Work For The Improvement Of The G-Line Embankment And The Accompanying Building, Lam Sebok Dam, Ubon Ratchathani Irrigation Project, Tha Muang Subdistrict, Don Mot Daeng District, Ubon Ratchathani Province (Ubon Ratchathani Irrigation Department) By Electronic Bidding Method
Renovation Of The Menzenberg Stadium In Bad Honnef
Improvement Of Consortium And Corporate Irrigation Management By Filling Up The Infrastructure At The North Gronda Canaletta With Restoration Of The Original Rural Landscape
115 Park Street Lights And Planting Irrigation Pipe Simple Repair Work Procurement Case
Construction Work Of Intake And Suction For Micro Irrigation System Janaq K'Uchu And Huayllapampa
Rfq-G1042024
Construction Contract For Primary Infrastructures Of Alvor Hydroelectric Power Plant - Phase 1
130710 - Instalación De Sistema De Riego Automatizado Del Centro De Semillas, Genética Y Entomología, Chillán
Mafr Well Repair
Provision for Modernization of climate change and natural disaster-resilient irrigation systems in the Vakhsh River Basin
Field Enhancement Design At South Delta Secondary School
A. Survey Work Of Gomti Right Embankment From Km 0.000 To Km 17.000 At Adarsha Sadar & Burichong Upazilla, B. Survey Work Of Gomti Right Embankment From Km 18.000 To Km 35.000 At Burichong& Brahmanpara, C. Survey Of Embankment Construction.
Rfq-G1042024