18 Live Notices for Italy Demolition Work Tenders
Showing 1 to 18
Oda/Td For The Assignment Of The Static Testing Task For The Community House Of Legnago (Vr) – New Construction Intervention Following The Demolition Of An Existing Building Located In Via Gianella, 1 – Cup F18I22000420003 Within The Pnrr – Mission 6 Health – Investment M6C1 – 1.1 Community Houses And Care Of The Person
Integrated Contracting Procurement Of The Executive Design Service, Including The Coordination Of Safety In The Design Phase And The Execution Of The Building Renovation Works With Demolition Of The Building In Via Gramsci N. 13 And Construction Of A Building Intended For Social Housing In Benefit Of The Municipality Of Segrate (Mi) Financed With Resources Pnrr M5C2I1.3.1 – Cup E64H22000320005
Open Procedure, Pursuant To Art. 71 Of Legislative Decree 36/2023, For The Awarding Of Architectural And Engineering Services Relating To The Management Of Works And Coordination Of Safety During The Execution Phase Relating To The Demolition And Reconstruction Works Of The Ix Martiri Giovinetti Funerary Complex In L'Aquila. Lot 1: Construction Of A Burial Vault For 2760 Bodies.
Award Of The Pfte Design Service, To Be Drawn Up In Bim, Relating To The Demolition And Reconstruction Of The Building Located In Rome, V.Le Boston 25, Intended For The New Headquarters Of Mase
European electronic tender with restricted procedure pursuant to art. 17 of Legislative Decree 208/2011 for the assignment of the works for the construction of the MULTINATIONAL DIVISION SOUTH (MND-S) HQ command building through the building renovation, following demolition, of buildings no. 3 and no. 5 at the Caserma Predieri in Florence (FI)
Cemetery Services Of The Municipality Of Roncoferraro
Technical-Economic Factual Design, Executive Design, Safety Coordination Design Phase, With Reserve Of Awarding The Optional Services Of Work Management And Safety Coordination Executive Phase New Da Vinci Middle School Gym (Cup F95E24000250005)
Technical-Economic Factual Design, Executive Design, Safety Coordination Design Phase, With Reserve Of Awarding The Optional Services Of Work Management And Safety Coordination Executive Phase New Da Vinci Middle School Gym (Cup F95E24000250005)
At5385/2024 "Renovation With Demolition And Reconstruction With Expansion Of The Avisio Corps Of The A.P.S.P. Giovanni Endrizzi Of Lavis (Tn)"
European Electronic Tender With Restricted Procedure Pursuant To Art. 17 Of Legislative Decree 208/2011 For The Assignment Of The Works For The Construction Of The Multinational Division South (Mnd-S) Hq Command Building Through The Building Renovation, Following Demolition, Of Buildings No. 3 And No. 5 At The Caserma Predieri In Florence (Fi)
European Electronic Tender With Restricted Procedure Pursuant To Art. 17 Of Legislative Decree 208/2011 For The Assignment Of The Works For The Construction Of The Multinational Division South (Mnd-S) Hq Command Building Through The Building Renovation, Following Demolition, Of Buildings No. 3 And No. 5 At The Caserma Predieri In Florence (Fi)
Ce 088922 - European Electronic Tender With Restricted Procedure Pursuant To Art. 17 Of Legislative Decree 208 Of 2011 For The Awarding Of The Construction Works Of The Command Building Of The Multinational Division South (Mnd-S) Hq Through Building Renovation Following Demolition Of Buildings No. 3 And No. 5 At The Predieri Barracks - Florence
Open Procedure For The Awarding Of Contracts For The Demolition And Reconstruction Works Of The Viaduct Over The Montone Torrent Sp 27Bis Braldo At Km 2+350 - 1St Section
Award Of The Pfte Design Service, To Be Drawn Up In Bim, Relating To The Demolition And Reconstruction Of The Building Located In Rome, V.Le Boston 25, Intended For The New Headquarters Of Mase
Notice Of Awarding The Negotiated Procedure - Demolition Works Of Unsafe Buildings Without Architectural, Historical Or Testimonial Interest, Forming Part Of The Dolo (Ve) Hospital, Construction Of A New Section Of Fence On Cia Dauli And Arrangement Of The Relevant External Areas. Cup J46G22000440002 - Cig A0415F577C. Total Starting Price: €221,922.56 (Vat Excluded).
Demolition Framework Agreement 2025-2027
Molise - Campobasso, Court Of Auditors. Construction Of The New Headquarters Of The Regional Offices Of The Court Of Auditors For Molise After Demolition Of The School Complex Located In Via Luigi D'Amato. Award Of The Preliminary Design Service Pfte, The Executive Design Service Pe And The Coordination Of Safety In The Design Phase Csp.
Sale Of Metallic Waste Produced At The Jrc, Ispra Site (Va) And Its Appurtenances