15 Live Notices for Italy Energy Efficiency Tenders
Showing 1 to 15
Works For The Functional Refurbishment, Restoration, Energy Efficiency Of Palazzo Riberia For Social Services Use Following The Insertion Of The Work In "Vigevano Inc", With The Name Of Community Skill Center. Awarding Of Technical Design Services, Work Management, Safety Coordination In The Design And Execution Phase According To Bim Modeling And Information Management Methods
Works For The Functional Refurbishment, Restoration And Energy Efficiency Of Palazzo Riberia For Social Services Use Following The Insertion Of The Work In "Vigevano Inc", With The Name Of Community Skill Center. Awarding Of Technical Design Services, Work Management And Safety Coordination According To Modeling And Management Methods In Bim
Cdc For Mic - Ercolano: Mixed Contracting Of Supplies And Ancillary Works For The Construction Of A Mobile Field Laboratory And A Technological Island - Archaeological Park Of Ercolano (Na)
Open Procedure For The Assignment Of The Implementation Of The Intervention Of “Energy Eco-Efficiency Of Existing Buildings Intended For Public Housing Services Owned Exclusively By Aler And The Municipalities Belonging To The First Five Classes Of Requirement Ex Prerp 2014-2016” Referred To In The Funds Pr Fesr 202127 Axis 2, Action 2.1.2 – In The Municipality Of Cinisello Balsamo – Via Friuli 3 – Code 600200U00. Financing: Pr Fesr 202127 Axis 2, Action 2.1.2 – Funds Ex L.R. 27/2009.
Management And Maintenance Service (Full Risk) Of Centralized, Cassette And Wall-Mounted Heating, Cooling, Air Conditioning And Ventilation Systems And Of Air Treatment Systems Present In The Hospital Facilities Of Vibo Valentia, Serra San Bruno, Tropea And Other Buildings Owned By Or In Interest Of The Vibo Valentia Provincial Health Authority For One Year.
Open Procedure For The Contracting Of The Executive Design Service And The Execution Of The Works For Regulatory Compliance And Energy Efficiency Improvement 1St Lot Of The Insulation And Windows Of The “Salvo D’Acquisto” Primary School In Via Europa, 38 In The Municipality Of San Donato Milanese (Mi) – Cup J56J20000620001
Integrated Procurement For The Executive Design And Execution Of The Works For The Energy Efficiency Intervention And Of The Liguria Region Offices Located In Genoa, Via Fieschi 15 And 17 Liguria Region Program European Regional Development Fund (Erdf) 2021-2027 – Action 2.1.1
Project Financing Pursuant To Art. 193 Paragraph 4 Of Legislative Decree 36/2023 And Successive Mm. For The Awarding Of The Concession For The Design, Construction, Management And Operation Of The Biomethane Production Plant, Derived From Anaerobic Digestion Of Zootechnical Wastewater And Agricultural By-Products With A Capacity Of 500 Smc/H, To Be Built Along The Sp 18 - Sheet 41, P.Lle 50,155 And 157
Integrated Procurement For The Executive Design And Execution Of Works For The Energy Efficiency Intervention And Of The Liguria Region Offices Located In Genoa, Via Fieschi 15 And 17 - Programme Of The Liguria Region European Regional Development Fund (Erdf) 2021-2027 – Action 2.1.1
Cdc For Mic - Ercolano: Mixed Contracts Of Supplies And Ancillary Works For The Construction Of A Mobile Field Laboratory And A Technological Island - Archaeological Park Of Ercolano (Na)
F065-2023 Awarding Of Maintenance Work Aimed At Improving The Energy Efficiency Of Air Conditioning Systems In The Research Area
F065-2023 Awarding Of Maintenance Work Aimed At Improving The Energy Efficiency Of Air Conditioning Systems In The Research Area
Maintenance Work Aimed At Improving The Energy Efficiency Of Air Conditioning Systems In The Research Area.
Engineering And Architecture Service, Design, Work Management, Safety Coordination Seismic Risk Mitigation Works, Energy Efficiency Improvement Of Nursery And Primary Schools
Dynamic Pa Acquisition System For The Supply And Installation Of Plants And Assets For The Production Of Energy From Renewable Sources And For Energy Efficiency. Id 2672