82 Live Notices for Water and Sanitation bids and RFP from Italy
Showing 1 to 20
Award Pursuant To Art. 50 Paragraph 1, Letter B) Of Legislative Decree No. 36/2023 For The Supply Of Nasal Irrigation Solution
Cpm - Exploratory Market Survey To Identify The O.E. To Which To Entrust, Pursuant To Art. 50, Paragraph 1, Letter B), Of Legislative Decree 36/2023, The Supply Of Drainage Devices For Pneumothorax
Complete Management Service Of The Sewer Lift Station Of The Rossano Prison
Framework Agreement With An Economic Operator For The Performance Of The Service Of Supply, Transport, Positioning, Collection, Cleaning Activities (According To The Uni En 16194 Standard), Maintenance And Waste Delivery, In Accordance With The Current Regulations Of Portable Toilets Not Connected To The Chemically Operated Sewerage Network For The Years 2025 2026 And 2027
Sewer Connection Works From The Empoli Purification Plant, Loc. Pagnana, To The Cuoiodepur Purification Plant In San Miniato
Market Survey For Direct Awarding Pursuant To Art. 50 Paragraph 1, Letter B) Of Legislative Decree No. 50/2023 For The Supply Of Devices Containing Solution For Irrigation Or Washing Of The Nasal Cavities And Nosopharynx Composed Of Bags Of Sterile Physiological Solution For Nasal Irrigation Plus Sterile Devices For Nasal Irrigation, Divided Into 6 Lots, For The Period Of 36 Months.
Hydraulic System Works On The Bagnolo And Pantano Canals - Rome Capital - 10Th Municipality - Executive Project 1St Part
Annual Supply Of Irrigation Tubes For Storz Hysteroscopy Columns Required By The Gynecology And Obstetrics Unit Of The P.O. Ospedale Del Mare /S.O. Barra (Single Lot)
24-Month Assignment Of The Sewer Network Cleaning Service, Collectors, Channels, Purification Plants, Sewage Lifting Managed By Alto Calore Servizi Spa And Sewage Transport To Authorized Treatment Plants
Supply Of Bellows Drainage System For The Period Of 3 Years
Supply Of Closed Circuit Bags For Urinary Drainage Required For Twenty-Four Months At The Urology Department.
Supply Of Bellows Drainage System For The Period Of 3 Years
Supply Of Closed Circuit Bags For Urinary Drainage Required For Twenty-Four Months At The Urology Department.
Competition No. 719/2024 Open Procedure For The Supply For 36 Months, Possibly Renewable For A Further 24 Months, Of Drainage Systems Divided Into 10 Lots
Hydraulic Regulation Of The Town Of Sant’Eufemia Through The Redevelopment Of The Naviglio Cerca Overflow Canal Of The Naviglio Grande Bresciano Upstream Of The Fognolo Mouth (Bs)
Mo Water Pump Primaporta
Reservoir For Lipofilling 1L
Ordinary And Extraordinary Maintenance Works, Emergency Response Of Civil And Industrial Works, Ordinary Roads, Electrical Systems In General, Water Supply And Distribution Systems
Supply With Installation Of Water Treatment Products For Steam Boiler Of The New Clinic At The Bolzano Hospital For The Year 2025
Open Procedure Through Framework Agreement With Multiple Economic Operators For Scheduled Maintenance Works On Networks And Systems (Water Supply, Sewerage And Purification)