Similar tenders from other countries.
Showing 1 to 20
Demolition and construction of new Viul bridge, Ringerike Municipality
Autoclaves for Ahus - Kongsvinger Hospital
No. 6456 Kverndammen
Tmm6207Oej0. P. Underground L2 Mm. Stretch: Row-Eugene Gross
State Procurement Of Reconstruction Works (Hereinafter Referred To As The Works) Of The N6 Tunnel Located At 120.2 Km Of The "Vladikavkaz-Tbilisi" Dn 700 Mm Main Gas Pipeline And The Gas Pipeline Passing Through It, In Accordance With Appendix No. 1 (Project Documentation).
Renovation Of Tunnels 4 And 12 Of The Ämmässuo Composting Plant Tp 5/25
2. S-Bahn Main Line Munich, Execution Planning For The Construction Of Hp Hauptbahnhof And Hp Marienhof Ve550
Auerberg Tunnel
Pipeline Construction And Fastenings, Energy Network Zurich Altstetten
Partial Renovation Of Rüssdorf Tunnel With Track Deflection In 3 Contract Lots
2. S-Bahn Main Line Munich, Execution Planning For The Construction Of Hp Hauptbahnhof And Hp Marienhof Ve550
14Tei10205 2Nd S-Bahn Main Line Munich – Ve 30 Structural Work Tunnel West With Trough And Hp Hauptbahnhofbahnhofplatz
2. Munich S-Bahn Main Line, Construction Section Underground East And Ostbahnhof, Tendering And Planning (Optional) Of The Main Construction Work Ve766
2. Munich S-Bahn Main Line, Construction Section Underground East And Ostbahnhof, Tendering And Planning (Optional) Of The Main Construction Work Ve766
Modernization Of The Railway Line Žilina – Košice, Section Of The Line Poprad Tatry (Outside) – Krompachy. Part: A.2 Vydrník (Outside) – Markušovce (Outside)
Escalator Replacement, Reconstruction And Barrier-Free Access At The Flora Metro Station – Geotechnical Monitoring And Passportization
Mainnetzausbau Süd - Project Management
2. S-Bahn Main Line Munich – Ve 30 Structural Work Tunnel West With Trough And Hp Hauptbahnhofbahnhofplatz
Tmm6207Oej0. P. Underground L2 Mm. Stretch: Row-Eugene Gross
2. S-Bahn Main Line Munich, Detailed Planning For The Construction Of Hp Hauptbahnhof And Hp Marienhof Ve550