Similar tenders from other countries.
Showing 1 to 20
Building Works Will Be Done
Cooling Group Sound Insulation Cabin Will Be Made
Increase Energy Efficiency And Energy Production From Res In Munich Elementary School Lehota
Bratislava, Dk - Reconstruction Of The Building No. 9 - R
Frame Work, Coverage, Tinkering, Scaffolding, Exterior Wooden Carpentry And Waterproofing: - Exchange: 950 M2 - Demolition Of A Zinc Cover: 416 M2 - Roof Insulation, New Zinc Cover, Tinkering: 416 M2 - Wooden Structure Extension: Lower Wood Floor, Wood/Roof Floor: 24 M2, Vertical Walls: 40 M2 Horizontal Waterproofing: 24 M2, Exterior Joinery + Blinds: 7 M2, Openwork Wood Cladding: 50 M2 Foreseeable Start Of Work: Phase 1 (Main Roof) - Early September 2025 / Phase 2 (Extension) - February 2026 Predictable Duration Of Work: Phase 1 - 30 Working Days, Phase 2 - 45 Working Days.
INSULATION SERVICES FOR INSPECTION ON CALL OFF BASIS
Zp/Czd/035/25 Modernization Of The "Re" Building In The Field Of The Ground Floor And The First Floor At The Institute "Monument - Children'S Health Center" In The "Design And Build" Mode Implemented As Part Of The Medical Fund "
Execution Of Works, Including Site Organization And Provision Of Equipment, "Increasing Energy Efficiency And Intelligent Energy Management In The Public Building With The Halmagel High School (C1 And C2)
Construction Of A Group Of Shared Equipment Zac Concorde, District Of The Faubourg De Béthune
Energetic Renovation Of The "La Souléïado" Nursery School.
Energy Renovation Of The School And Municipal Accommodation.
Energy Renovation On School Buildings.
Louis Senillon Residence.
Renoir Les Alagniers - Demolition Of 48 Dwellings And Rehabilitation And Residentialization Of 72 Collective Dwellings Within The Framework Of An Anru Project
Maintenance, Repair And Development Of Municipal Buildings
Rehabilitation Of The Youth And Seniors' Room. Creation Of An Intergenerational Room.
Construction Of Rental Housing.
Construction Of A Sports Board On The Viardière Field
Partial Renovation Of The Ground Floor Of The Town Hall And Rehabilitation Extension Of The Multipurpose Room
Rehabilitation Of The Nave Building